Logo
EQR - A Connected Tungsten Platform

Mt Carbine Tungsten Mine Key Facts

Location Far North Queensland, Australia
Ownership 100% EQR
Status In Production
Commodity Tungsten concentrate (WO₃)
Mineral Resource 40.80Mt @ 0.22% WO₃ (as at 30 June 2026)
Contained Tungsten 9.06 million mtu WO₃
Reserve Mine Life Minimum 8 years
Reserve Conversion ~23% of resource converted to reserves
FY26 Production 28,280 mtu WO₃
September 2026 Quarter 17,145 mtu WO₃ (up 31% on the June quarter)
Targeted Production 225,000 mtu p.a. (aspirational production target only)
Processing TOMRA XRT ore sorting + gravity concentration

Mineral Resource as at 30 June 2026, reported under the JORC Code (2012) in the EQ Resources Limited 2026 Annual Report (released to ASX on 30 September 2026). FY26 production from the 2026 Annual Report; September 2026 quarter production from the 6 October 2026 quarterly update. Targeted production is an aspirational target only and is not a formal production target, guidance or forecast.

Forward-looking statements: this page contains forward-looking statements that are subject to risks and uncertainties, and actual results may differ materially. Please read our Terms and conditions.

Growth Focus

01

Advancing access to the high-grade Iolanthe Vein

1.6Mt @ 0.262% WO₃

02

Delivering the Mt Carbine Expansion Project

Increasing crushing capacity from ~1 to ~2 Mtpa

03

28-hole, ~7,700m resource and reserve drilling program

04

Advancing ~12,000m drill program at Wolfram Camp

05

Assessing underground mining potential

06

Advancing regional hub-and-spoke opportunities

Growth initiatives are forward-looking and subject to risks and uncertainties, and outcomes may differ materially. Please read our Terms and conditions.

Orebody Resource Classification Tonnes (Mt) Grade (% WO₃) WO₃ (mtu)
In-Situ Indicated 17.34 0.28% 4,935,823
Inferred 10.64 0.30% 3,201,048
Subtotal 28.00 0.29% 8,136,871
Low-Grade Stockpile Indicated 9.38 0.075% 703,546
Inferred 2.58 0.070% 167,696
Inferred 0.83 0.060% 53,318
Subtotal 12.80 0.07% 924,559
All Total 40.80 0.22% 9,061,430

Mt Carbine Mineral Resources as at 30 June 2026 (JORC Code 2012), from the EQ Resources Limited 2026 Annual Report. Totals may not add up due to rounding.

The information on this page relating to Mineral Resources is extracted from the Annual Mineral Resources Statement in the EQ Resources Limited 2026 Annual Report, released to ASX on 30 September 2026, and is based on information compiled by Mr Michael Mills (Competent Person, MAusIMM, Xenith Consulting Pty Ltd). EQR confirms that it is not aware of any new information or data that materially affects the information included in that announcement and that all material assumptions and technical parameters underpinning the estimates continue to apply and have not materially changed. EQR confirms that the form and context in which the Competent Person's findings are presented have not been materially modified from that announcement.