Quarterly Activities Report - Quarter ended 30 June 2026 Page 1
EQ Resources Limited
Quarterly Activities Report
Quarter Ended 30 June 2026
1
Year-end procedures have identified an administrative error in invoices supplied to a specific Customer. This has the potential to
increase revenue by US$12.2 million. Discussions are underway with the Customer to resolve in a timely manner.
HIGHLIGHTS
FINANCIAL PERFORMANCE
• A record A$22.5 million of operating cash flow was generated during the quarter, with cash on hand at 30
June 2026 of A$28 million and A$17 million in accounts receivable.
• A record A$79 million1 of revenue (Q3 FY2026: A$33 million) was generated during the quarter, a quarter-
on-quarter increase of 140%.
MT CARBINE OPERATIONS
• Production climbed 176% to 13,050 mtu (Q3 FY2026: 4,737 mtu), with grade continuing to improve as
mining progresses deeper into the high-grade Iolanthe vein system. This is the highest quarterly
production since Q1 FY2024.
• A record 1.1 million tonnes of material was moved during the quarter (Q3 FY2026: 821,678 tonnes),
averaging 350,000 tonnes per month.
• The A$39 million expansion project was approved on 3 June 2026. The expansion project will automate
and increase the crushing circuit from ~1 Mtpa to ~2 Mtpa and is expected to be commissioned in Q3
FY2027.
BARRUECOPARDO OPERATIONS
• Dewatering of the southern pit from the 1-in-50-year rain event in Q3 FY2026 continued throughout the
quarter. Access to the southern pit for clean-up and mining was achieved on 4 July 2026, regaining access
to 1.2 Mt of ore at 0.186%. First blast completed on 8 July 2026 with ore presented for processing on 10
July 2026.
• Mining continued in the northern pit, with a record 2.52 Mt of material was moved during the quarter (Q3
FY2026: 2.26 Mt), representing an increase of 11%.
• Hampered by the water in the southern pit, production for the quarter totalled 15,265 mtu (Q3 FY2026:
18,768). Recoveries throughout the quarter improved to 58.8% in June with WO₃ production increasing
to 6,544 mtu in June 2026, including the plant's highest weekly mtu output in 15 weeks.
RESOURCES AND RESERVES
• Mt Carbine drilling continued throughout the period with 41 holes drilled for a total of 10,759 metres.
• Barruecopardo commenced the 12,200 m drill program focus on resource expansion and in-fill drilling.
TUNGSTEN MARKET
• Fastmarkets Ammonium Paratungstate (“APT”) CIF Rotterdam/Baltimore low-price was US$2,900 per
mtu on 30 June 2026, +4% increase Quarter-On-Quarter (QoQ) and a +559% increase Year-On-Year
(YoY) from US$440 on 30 June 2025. The average low price for the quarter was US$2,900/mtu.
resourcing the new economy for a better tomorrow
Quarterly Activities Report - Quarter ended 30 June 2026 Page 2
EQR GROUP Q4 FY2026 – PERFORMANCE STATISTICS SUMMARY
Operations Mt Carbine Barruecopardo EQR Group
Unit
Q3
FY2026
Q4
FY2026
Q3
FY2026
Q4
FY2026
Q3
FY2026
Q4
FY2026
Safety Performance
LTIFR Freq. 32 43 20 16 26 30
Operational Performance
Material blasted t 582,237 1,170,837 2,556,468 2,637,915 3,138,705 3,808,752
Total Tonnes Mined t 821,678 1,059,120 2,260,204 2,518,482 3,081,882 3,607,602
Waste mined t 726,453 804,478 2,098,118 2,257,519 2,824,571 3,091,997
Ore mined t 95,795 254,642 162,086 260,963 257,881 515,605
Strip Ratio W:O 7.6 : 1 3.2 : 1 12.9 : 1 8.7 : 1 11 : 1 6 : 1
Closing Ore Stock - ROM t 83,785 94,890 123,100 51,072 206,885 145,962
Closing Ore Stock - LGS t 9,393,566 9,380,607 519,782 503,620 9,913,348 9,884,227
Crushing Plant Feed t 103,345 188,322 413,303 458,504 516,648 646,826
Gravity Plant Feed t 45,239 70,349 218,297 222,752 263,536 293,101
Gravity Plant Grade % 0.140% 0.258% 0.162% 0.126%
Recovery % 77% 68% 53% 54%
WO3 Produced1
mtu 4,737 13,050 18,768 15,265 23,505 28,315
WO3 Sold1
mtu 4,077 14,115 19,515 15,353 23,592 29,468
Avg Realised price US$/mtu 1,189 1,997 965 1,763 962 1,875
Nominal cash cost2
US$/mtu 1,452 1,115 349 366 572 711
1 1 mtu (metric tonne unit) = 10kg 100% WO3
2 Nominal cash cost being cost of goods sold after inventory movement
Group Quarterly Summary
Production for the quarter increased 20% to 28,315 mtu’ (Q3 FY2026: 23,505) driven by a step change at Mt Carbine as
access to the higher-grade Iolanthe vein was consistently delivered for processing.
Cash flow generated from operating activities during the quarter achieved a record A$22.5 million as the increase in
production meets the record tungsten prices in a structurally short supply side environment.
Increase in cash costs per mtu largely driven by the production mix between Mt Carbine and Barruecopardo, the record
material moved across the business, continued investment in maintenance strategies and higher diesel prices. Nominal
cash cost per mtu is expected to reduce as production continues to ramp up and strip ratios improve.
The Mt Carbine expansion project started in earnest with A$3.5 million of the A$39 million project expended during the
quarter.
Resource and reserve drill programs at both operations progressed well during the period with more than 10,000 metres
drilled in the quarter.
resourcing the new economy for a better tomorrow
Quarterly Activities Report - Quarter ended 30 June 2026 Page 3
MT CARBINE OPERATIONS
Health and Safety
Despite maintaining a strong focus on safety performance and workforce engagement throughout the quarter, Mt Carbine
experienced an increase of 22% in its LTIFR during the period. Ongoing safety assurance activities, training and testing
programs are continuously delivered and performed on a day-to-day basis.
Open Cut Mining
Mining operations advancing on the south wall in early July, with ore grades increasing as mining progresses deeper into
the Iolanthe vein.
Mt Carbine delivered a record quarter with mining activity continuing to build each month as access to the high-grade
Iolanthe vein expanded through the Stage II pit. Material blasted more than doubled to 1,170,837 tonnes (Q3 FY2026:
582,237 tonnes), including a record blasting month in June supported by an improved drill and blast design featuring tighter
hole spacing, angled holes and double priming to reduce oversize generation.
Total material extracted increased to 1,059,120 tonnes (Q3 FY2026: 821,678 tonnes), comprising 254,642 tonnes of ore,
up 166% on the 95,795 tonnes mined in Q3 FY2026, and 804,478 tonnes of waste (Q3 FY2026: 726,453 tonnes). The
strip ratio improved materially to 3.2:1 (Q3 FY2026: 7.6:1), reflecting the higher proportion of ore now being delivered as
mining progresses through the Iolanthe vein system.
Operations were constrained at the start of the quarter by elevated pit water for blasts at the 315 level, with additional
pumping capacity mobilised to restore access. Workforce availability became the more significant constraint through May,
with reduced staffing levels limiting mining continuity; a recruitment campaign progressively rebuilt crews through the
month, restoring fuller productivity into June. A GPS-based grade control system was introduced late in the quarter to
improve ore delineation and reduce dilution in the narrow, high-grade veins now being mined, with blast movement software
to follow.
Processing
Processing performance lifted materially in line with higher ore availability from the Iolanthe vein. Crushing plant feed
increased to 188,322 tonnes (Q3 FY2026: 103,345 tonnes), supported by additional rock breakers brought online to clear
recurring oversize backlogs, though throughput was periodically constrained by high-grade cone crusher reliability issues.
Ore sorted totalled 139,327 tonnes (Q3 FY2026: 54,907 tonnes), with sorter concentrate production of 13,279 tonnes.
Utilisation was intermittently limited by upstream feed availability and a scheduled five-day shutdown in May for a screen
rebuild and TOMRA ejection-module update, offset by strong throughput when fed.
resourcing the new economy for a better tomorrow
Quarterly Activities Report - Quarter ended 30 June 2026 Page 4
Gravity plant feed rose to 70,349 tonnes (Q3 FY2026: 45,239 tonnes), with feed grade increasing sharply to 0.258% WO₃
(Q3 FY2026: 0.140%), reflecting the shift to higher-grade Iolanthe ore. Recovery for the quarter averaged 68%, broadly in
line with the 77% achieved in Q3 FY2026, though recovery softened in June to 66.7% as lower-grade recirculating material
and workforce constraints weighed on plant performance late in the quarter.
Mt Carbine achieved the highest quarterly production since Q1 FY2024. Production totalled 13,050 mtu, up 176% on the
4,737 mtu produced in Q3 FY2026, with product sold increasing to 14,115 mtu (Q3 FY2026: 4,077 mtu). Recovery
improvement projects, including quad-deck tables, screen upgrades and the motor control centre (MCC) upgrade, all
remain in progress and are expected to further lift plant throughput and stability into FY2027.
EQR Approves Mt Carbine Expansion
In June 2026, the Board approved the A$39 million Mt Carbine Expansion Project, targeting full commissioning in Q3
FY2027. The Project will lift crushing capacity, the operation's current processing bottleneck, from approximately 1 Mtpa
to 2 Mtpa, while automating and integrating crushing, screening, ore sorting and product handling into a single flow,
reducing material handling by a factor of eight. The increased capacity is initially expected to add 500 tonnes of WO₃ per
annum through processing of the low-grade stockpile, with further upside available from Mt Carbine resource conversion
and other regional sources, supporting EQR's regional hub-and-spoke strategy. Site works and commissioning are
expected to progress from June 2026 through February 2027, with full plant acceptance targeted for March 2027, funded
through current cash reserves and cash flows generated from operations.
ASX Announcement dated 3 June 2026: ‘EQR Board Approves Mt Carbine Expansion.’
BARRUECOPARDO OPERATIONS
Health and Safety
Barruecopardo maintained a strong focus on safety performance and workforce engagement throughout the quarter,
resulting in a 20% improvement in the Lost Time Injury Frequency Rate (LTIFR) during the period. Ongoing safety
assurance activities, training and testing programs are continuously delivered and performed on a day-to-day basis.
Open Cut Mining
Northern area of the pit and temporary sump. Operations are currently mining Phase 6 at elevation 645 RL, with
ore grade increasing. 8 July 2026.
resourcing the new economy for a better tomorrow
Quarterly Activities Report - Quarter ended 30 June 2026 Page 5
Mining operations at Barruecopardo during the quarter continued to be significantly impacted by the 1-in-50-year rain event
of Q3 FY2026, with pit dewatering remaining the operation's primary focus throughout the quarter. Mining operation
resumed at the bottom of the pit on 8 July. Material blasted for the quarter totalled 2,637,915 tonnes, broadly in line with
the Q3 FY2026 (2,556,468 tonnes), while a record total material extracted increased to 2,518,482 tonnes for the quarter
(Q3 FY2026: 2,260,204 tonnes).
Ore mined increased materially to 260,963 tonnes, up from 162,086 tonnes in Q3 FY2026, as access progressively
improved through Phases 6 and 7. Waste mined rose to 2,257,519 tonnes (Q3 FY2026: 2,098,118 tonnes), consistent with
waste production continuing to track ahead of plan as the operation prioritised bench development and pit floor preparation
over the dewatering period. The strip ratio improved to 8.7:1 (Q3 FY2026: 12.9:1), reflecting a higher proportion of ore
relative to waste as access to the pit expanded.
Grades mined through the quarter remained modest, consistent with the current mining horizon, averaging in the 0.11%–
0.16% WO₃ range as the operation worked through the upper areas of the north pit and Phase 6 material. Higher-grade
zones identified in the north pit are expected to be accessed as dewatering completes, supporting improved grade delivery
into the first quarter of FY2027.
Processing
Processing performance at Barruecopardo strengthened progressively through the quarter, despite feed constraints
associated with restricted mining access. Ore crushed totalled 458,504 tonnes, up from 413,303 tonnes in Q3 FY2026,
supported by the continued use of a mobile jaw crusher to supplement the fixed plant and a ceramic jaw trial that more
than doubled wear life relative to standard components.
Ore sorted increased to 186,837 tonnes, with sorter feed rates lifted from around 100 tph to 130–150 tph across the quarter
as feeder constraints were progressively addressed; sorter recoveries remained strong throughout, exceeding 98% in test
conditions, though full utilisation of all three sorters was periodically limited by upstream feed availability.
Gravity plant feed increased slightly to 222,752 tonnes (Q3 FY2026: 218,297 tonnes), while feed grade declined to 0.126%
WO₃ (Q3 FY2026: 0.162%), reflecting the lower-grade stockpile and access-constrained ore processed through April and
May. Recovery improved over the course of the quarter, from 51.7% in April to 58.8% in June, supported by the resumption
of the Falcon concentrator circuit and vacuum filter, with June delivering the plant's best weekly mtu output in 15 weeks.
Production for the quarter totalled 15,265 mtu, down from 18,768 mtu in Q3 FY2026, reflecting reduced ore access over
April and May. Production recovered strongly through the quarter, with June alone contributing 6,544 mtu, more than the
entire April output (4,113 mtu) and ahead of May (4,608 mtu), underscoring the momentum building into Q1 FY2027 as
dewatering nears completion.
On 10 July 2026, the Company received from the Territorial Service of Industry, Commerce & Economy of Salamanca a
notice of partial non-compliance with the restoration mining plan at the Barruecopardo Mine, relating to water management.
Operations continue as normal. Where there is risk of immediate environmental harm the regulator has the right to
temporarily suspend operations. The Company assesses the risk of a temporary suspension of processing operations as
low, as no environmental harm has occurred and there has been no discharge from the site. The Company is working
constructively with the regulator and will submit temporary measures for immediate implementation, as well as permanent
solutions to be implemented following their approval during FY2027. Any material developments will be advised to the
market.
resourcing the new economy for a better tomorrow
Quarterly Activities Report - Quarter ended 30 June 2026 Page 6
EXPLORATION ACTIVITIES
Australia - Regional Exploration
Mt Carbine Drilling Campaign
The Phase 1, 2026 drilling program at Mt Carbine progressed well during the quarter, with up to two diamond drill rigs and
one RC drill rig operating concurrently. A total of 41 drill holes have been completed to 30 June 2026, comprising 7,144
metres of diamond drilling and 3,615 metres of RC drilling. The program design is being updated to incorporate both
resource extension and near-mine exploration phases. Assay results have started to be received and will be reported to
the market separately once quality and compliance checks have been completed, in accordance with the Company's
continuous disclosure obligations.
Wolfram Camp
During the quarter, activity at Wolfram Camp shifted from exploration planning to progressing the project’s key regulatory
and technical workstreams. Preliminary work on the Mining Lease application continued, with the ML boundary shared with
technical and tenure advisers and native title consultants engaged to advance the required landholder and native title
processes. The drilling program is scheduled to commence in July 2026 and run in parallel with a geophysical Induced
Polarisation (IP) survey to refine drill targets before and during the program. Both activities will follow completion of the
current Mt Carbine drilling program, with mobilisation and execution planned through to the end of October 2026.
Environmental baseline studies, including ecological and fauna surveys and site mapping, also continued under the
Company’s environmental consultants. The Company continues to engage specialist technical, environmental and legal
advisers to progress these workstreams as it works toward a return to mining operations at Wolfram Camp.
Tenement Acquisition Supporting Mt Carbine Hub-And-Spoke Strategy
On 9 June 2026, EQR entered into a binding heads of agreement with Sunshine (Triumph) Pty Ltd, a subsidiary of Sunshine
Metals Limited, to acquire a 100% legal and beneficial interest in the Hodgkinson tenement package (six granted
Exploration Permits for Minerals covering approximately 365 km² adjacent to Mt Carbine) for a total consideration of
A$250,000, subject to regulatory and third-party approvals. Completion expected shortly after conditions precedent are
satisfied or waived by the 31 August 2026 long-stop date.
ASX Announcement dated 9 June 2026: EQR Tenement Acquisition Supporting Mt Carbine Hub Strategy
Spain - Regional Exploration
Barruecopardo Commences Drilling to Support Resource Growth
In early June 2026, EQR commenced Phase 1 of its 2026 drilling program at Barruecopardo, comprising 36 drill holes for
approximately 12,200 metres over an expected eight-month campaign, budgeted at approximately A$2.47 million. The
program targets resource extensions to the north and south of the current open pit as well as deeper zones below the
existing mine design, with the deposit remaining open in each direction, and is intended to support mine life extension,
inform optimisation studies and future authorisations, and contribute to an updated resource estimate. Two drill rigs are
currently operating and had already completed 838 metres of drilling by the end of June, with final results and an updated
resource estimate expected around two months after drilling completes.
FINANCIAL MANAGEMENT AND CONTROL
Quarterly Cash Flow Summary
A record cash on hand of A$28 million and a record A$ 17 million accounts receivable as at 30 June 2026 resulting from
improved production and record tungsten prices.
Summary of cash movement for the quarter is as follows:
Opening cash balance A$ 15.5 m
Cash inflows from operating activities A$ 22.5 m
resourcing the new economy for a better tomorrow
Quarterly Activities Report - Quarter ended 30 June 2026 Page 7
Cash outflows from investing activities (A$ 13.5 m)
Cash inflows from financing activities A$ 3.5 m
Closing cash balance A$ 28.0 m
Cash Flows from Operating Activities
A record A$22.5 million of cash flows was generated from operating activities during the quarter (Q3 FY2026: negative A$
11.5 million). The significant step change is driven by improved production and the record tungsten price due to the
structural global shortage in the market.
The increase in operating cash costs was primarily driven by the significant increase in material moved at Mt Carbine,
equipment hire, proactive maintenance and increased labour hire as we recruit permanent employees to support the
planned ramp in production.
Cash Flows from Investing Activities
Net cash used in investing activities totalled A$13.5 million during the quarter (Q3 FY2026: A$ 4.4 million). Increased
expenditure was primarily attributed by the:
• Commencement of the A$39 million expansion project at Mt Carbine
• Resource expansion and infill drilling programs at Mt Carbine and Barruecopardo
• Continued replacement and improvement to operating equipment and capital spare parts.
Cash Flows from Financing Activities
Net cash inflow from financing activities totalled A$3.5 million during the quarter. This primarily consisted of the exercise
of historical options during the period.
TUNGSTEN MARKETS
Tungsten market conditions remained supportive during the quarter, underpinned by continued supply constraints outside
China and sustained customer focus on security of supply. The ammonium paratungstate (APT) market, which serves as
the benchmark for the Company's concentrate sales, remained firm throughout the quarter, with prices strengthening
following the small correction experienced earlier in the year. Customer engagement continued to be driven by long-term
availability, traceability and supply chain resilience.
While Chinese domestic tungsten prices remained more volatile, international market fundamentals continued to reflect
constrained non-Chinese concentrate availability and limited near-term new mine supply. EQ Resources remains well
positioned to benefit from these structural market dynamics through its operating production base, established customer
relationships and strategic focus on supplying secure, non-Chinese tungsten concentrate into global markets. Market
observations are based on Fastmarkets APT benchmark pricing and Shanghai Metals Market (SMM) industry analysis and
ongoing engagement with customers.
resourcing the new economy for a better tomorrow
Quarterly Activities Report - Quarter ended 30 June 2026 Page 8
12 Month History of APT Low-Price. Price on 30th
June 2026. Source: Fastmarkets. Tungsten APT 88.5% WO3
(min), CIF Rotterdam and Baltimore, duty-free, $/mtu WO3
MINERAL RESOURCES AND ORE RESERVES
Mineral Resources and Ore Reserves
There has been no material change to the Company's Mineral Resources and Ore Reserves since the last publication. For
the latest information, please refer to:
• Mt Carbine & Barruecopardo (Life of Mine & production target clarification): ASX Announcement 12 December 2025:
“Clarification of Production Targets and Life of Mine Plans”.
• Mt Carbine Mine: EQR Annual Report FY2025
• Barruecopardo Mine: ASX Announcement 22 October 2025: “EQ Resources Barruecopardo Mine Increases Ore
Reserves by 39%”.
Tenements
The current tenement interests are disclosed below in accordance with ASX Listing Rule 5.3.3. Whilst the Company entered
into a binding agreement to acquire six exploration permits during the quarter, completion is scheduled for Q1 FY2027 and
the tenement have therefore therefore been excluded from the Australia tenement listing.
Australia
Note:
- EPM 14871 & EPM 14872 Renewal lodged, pending registration.
320
820
1,320
1,820
2,320
2,820
3,320
Jul-25 Aug-25 Sep-25 Oct-25 Nov-25 Dec-25 Jan-26 Feb-26 Mar-26 Apr-26 May-26 Jun-26
APT
Low
Price
($US/mtu)
12 months - APT Low Price (CIF EU/US) $US
Location Holding Entity
Beneficial
Interest
Interest
Acquired or
Disposed
Area Expiry date
Queensland, Australia
ML 4867 Mt Carbine Quarries Pty Ltd 100% N/A 358.5 ha 31/07/2041
ML 4919 Mt Carbine Quarries Pty Ltd 100% N/A 7.891 ha 31/08/2041
EPM 14871 EQ Resources Limited 100% N/A 10 sub-blocks 12/12/2025
EPM 14872 EQ Resources Limited 100% N/A 21 sub-blocks 11/12/2025
EPM 28898 EQ Resources Limited 100% 17/06/2024 147 sub-blocks 17/06/2029
ML = Mining Lease; EPM = Exploration Permit for Mineral (Qld); EL = Exploration License (NSW)
resourcing the new economy for a better tomorrow
Quarterly Activities Report - Quarter ended 30 June 2026 Page 9
Spain
SUSTAINABILITY & SOCIAL PROGRAMS
For more information on the Company’s ESG commitments and ongoing initiatives, please visit EQR’s LinkedIn, Saloro’s
LinkedIn and the Sustainability page on EQR’s website.
Released on the authority of the Board by: Further Enquiries:
Craig Bradshaw Rosalyn MacNeill
Managing Director ir@eqresources.com.au
About EQ Resources Limited
EQ Resources Limited is a leading global tungsten mining company dedicated to sustainable mining and processing
practices. The Company is listed on the Australian Securities Exchange, with a focus on expanding its world-class tungsten
assets at Mt Carbine in North Queensland (Australia) and at Barruecopardo in the Salamanca Province (Spain). The
Company leverages advanced minerals processing technology and unexploited resources across multiple jurisdictions,
with the aim of being a globally leading supplier of the critical mineral, tungsten. The Company aims to create shareholder
value through the exploration and development of its current project portfolio whilst continuing to evaluate corporate and
exploration opportunities within the new economy and critical minerals sector globally.
Forward-looking Statements
This announcement may contain forward-looking statements. Forward-looking statements address future events and
conditions and, therefore, involve inherent risks and uncertainties. Actual results may differ materially from those currently
anticipated in such statements. Particular risks applicable to this announcement include risks associated with planned
production, including the ability of the Company to achieve its targeted production outline due to regulatory, technical or
economic factors. In addition, there are risks associated with estimates of resources, and there is no guarantee that a
resource will have demonstrated economic viability as necessary to be classified as a reserve. There is no guarantee that
additional exploration work will result in significant increases in resource estimates. Neither the Australian Securities
Exchange nor its Regulation Services Provider (as that term is defined in the policies of the Australian Securities Exchange)
accepts responsibility for the adequacy or accuracy of this announcement.
Follow us:
Location Holding Entity
Beneficial
Interest
Interest
Acquired
Area Expiry date Granting
Salamanca, Spain
C.E. Barruecopardo, 6.432-10 Saloro, SLU 100% 18/01/2024 2,100 Ha 1/11/2041 20/11/2014
P.I. Saldeana 1a
Fracción, 6.432-11 Saloro, SLU 100% 18/01/2024 13 Aug.* 13/08/2001
P.I. Saldeana 2a
Fracción, 6.432-12 Saloro, SLU 100% 18/01/2024 13 Aug.* 13/08/2001
P.I. Milano, 6.432-20 Saloro, SLU 100% 18/01/2024 29,000 Ha 13 Aug.* 13/08/2011
P.I. Cortegana, 6.570 Saloro, SLU 100% 18/01/2024 16,700 Ha 14 Nov.* 14/11/2006
P.I. Almonaster, 6.572 Saloro, SLU 100% 18/01/2024 4,300 Ha 14 Nov.* 14/11/2006
P.I. Aracena, 6.649 Saloro, SLU 100% 18/01/2024 5,300 Ha 30 Oct.* 30/10/2008
P.I. Brincones, 6.834 Saloro, SLU 100% 18/01/2024 6,100 Ha 7 May* 7/05/2013
C.E. = Mining Lease; *P.I. = Exploration Permit w hich is renew ed annually.
29,300 Ha
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
EQ RESOURCES LIMITED
ABN Quarter ended (“current quarter”)
77 115 009 106 30 June 2026
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(12 months)
$A’000
1. Cash flows from operating activities
68,977 125,258
1.1 Receipts from customers
1.2 Payments for
(1) (2)
(a) exploration & evaluation
(b) development - (6)
(c) production (29,495) (82,619)
(d) staff costs (10,243) (34,991)
(e) administration and corporate costs (2,843) (6,522)
1.3 Dividends received (see note 3) - -
1.4 Interest received 63 250
1.5 Interest and other costs of finance paid (928) (4,727)
1.6 Income taxes paid (2,931) (2,931)
1.7 Government grants and tax incentives (506) (506)
1.8 Other 279 1,187
1.9 Net cash from / (used in) operating
activities
22,372 (5,609)
2. Cash flows from investing activities
(389) (1,664)
2.1 Payments to acquire or for:
(a) entities
(b) tenements (4,970) (5,281)
(c) property, plant and equipment (3,684) (8,457)
(d) exploration & evaluation (if capitalised) (2,922) (2,946)
(e) investments - -
(f) other non-current assets - -
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(12 months)
$A’000
2.2 Proceeds from the disposal of:
- -
(a) entities
(b) tenements - 6
(c) property, plant and equipment - -
(d) investments - -
(e) other non-current assets (1,506) (1,506)
2.3 Cash flows from loans to other entities - -
2.4 Dividends received (see note 3) - -
2.5 Other (provide details if material) - (3,582)
2.6 Net cash from / (used in) investing
activities
(13,471) (23,430)
3. Cash flows from financing activities
- 55,748
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
- 683
3.3 Proceeds from exercise of options 4,011 23,188
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
(332) (4,572)
3.5 Proceeds from Borrowings - -
3.6 Repayment of borrowings (2,267) (53,042)
3.7 Transaction costs related to loans and
borrowings
- -
3.8 Dividends paid - -
3.9 Other
- Lease Repayments
- Proceeds from Concentrate Sale
Prepayments
-
2,016
(4,534)
38,180
3.10 Net cash from / (used in) financing
activities
3,428 55,651
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
15,783 1,873
4.2 Net cash from / (used in) operating
activities (item 1.9 above)
22,372 (5,609)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
(13,470) (23,430)
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 3
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(12 months)
$A’000
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
3,428 55,651
4.5 Effect of movement in exchange rates on
cash held
51 (321)
4.6 Cash and cash equivalents at end of
period
28,164 28,164
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 28,164 15,783
5.2 Call deposits - -
5.3 Bank overdrafts - -
5.4 Term Deposits - -
5.5 Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
28,164 15,783
6. Payments to related parties of
Share your feedback