Annual Report to shareholders
Released
Released
Announcement PDF
Annual
2026
Report
Directors
Michael Nossal
Non-Executive Chair
Craig Bradshaw
Managing Director
Oliver Kleinhempel
Non-Executive Director
Zhui Pei Yeo
Non-executive Director
Stephen Weir
Non-Executive Director
Nicole Brook
Non-Executive Director
Constandinos (Taki) Dermedgoglou
Non-Executive Director
Company Secretary
Virna Trout
Registered Office
Level 7A, 410 Queen Street
Brisbane, 4000, QLD
T +61 (0)7 4094 3072
W www.eqresources.com.au
E info@eqresources.com.au
Principal Place of Business
6888 Mulligan Highway
Mount Carbine QLD 4871
Share Register
Automic Pty Ltd
Level 5, 126 Phillip Street,
Sydney NSW 2000
T +61 (0)2 9698 5414
Auditors
Nexia Melbourne Audit Pty Ltd
Level 35, 600 Bourke Street
Melbourne VIC 3000
T +61 (0)3 8613 8888
F +61 (0)3 8613 8800
Stock Exchange Listing
Listed on the Australian Securities Exchange (ASX)
ASX Code: EQR
ACN: 115 009 106
ABN: 77 115 009 106
Corporate Directory
1 Non-Executive Chair’s Address
4 Managing Director’s Address
6 About EQ Resources Limited
7 Financial Review
9 Review of Operations
9 Barruecopardo Mine (Spain)
13 Mt Carbine Operations (Australia)
18 EQR Tenements
18 EQR Tenement Interests
20 Risk Management and Sustainability
25 Directors’ Report
44 Consolidated Statement of Profit or Loss and Other Comprehensive Income
45 Consolidated Statement of Financial Position
46 Consolidated Statement of Cash Flows
47 Consolidated Statement of Changes in Equity
48 Notes to the Consolidated Financial Statements
103 Consolidated Entity Disclosure Statement
105 Directors’ Declaration
106 Auditor’s Independence Declaration
107 Independent Auditor’s Report
112 Shareholder Information
115 Forward Looking Statements
Contents
Non-Executive
Chair’s Address
I am pleased to present my first letter to you as Chair of
EQ Resources Limited. I joined the Board on 31 March
2026, nine months into a financial year that tested the
Company and all its stakeholders.
FY2026 began with some questions about the
Company’s liquidity and its ability to continue as a
going concern. It finished with the balance sheet
recapitalised, a record June quarter for revenue
and operating cash flow, and an unmodified audit
opinion, as Craig Bradshaw sets out in his Managing
Director’s letter. By the time I joined the Board, the
turnaround was well underway and the Company’s
long-held potential was beginning to be realised. That
is to the credit of the EQR team and of the Board that
preceded me, led by Oliver Kleinhempel, who served
as Chair through the hardest part of the year. There is,
of course, still much to do to realise that potential fully.
We are all conscious that the recapitalisation over the
last two years came at a cost to existing shareholders,
and the Board thanks those shareholders who
supported the placements when the outlook was far
from certain. It is now incumbent on us to continue
turning that support into sustained value creation.
The most important part of that effort concerns the
safety and wellbeing of our people. The Board is not
satisfied with the safety outcomes during FY2026,
although we acknowledge the considerable effort and
investment made by management. We do consider
that the audits and safety leadership changes now
in train are the appropriate actions, and we will be
monitoring the safety outcomes closely during
FY2027 with a clear expectation of measurable
improvement.
The market in which we operate has changed
fundamentally since the start of FY2026. Tungsten
is a critical mineral in the fullest sense: essential to
industrial manufacturing, aerospace, energy and
defence, with supply concentrated in a small number
of countries. In a period of complicated geopolitics,
Western governments are paying far more attention
to the provenance and security of supply, while prices
have risen well beyond anything in the Company’s
history. This places EQR in a position of rare strategic
and commercial opportunity. As one of the few
established tungsten producers outside China, with
operating mines in Australia and Spain, EQR is already
integrated into Western-aligned supply chains and
continues to position itself to benefit from the strong
price environment. The Board’s responsibility is to
ensure that disciplined, reliable execution converts
this opportunity into sustained value.
Accordingly, we are aligned on the strategy to do this.
First, deliver reliable production from Mt Carbine and
Barruecopardo, with greater resilience to weather
and operating disruptions. Second, grow the reserves
and resources around each mine. Third, pursue
regional exploration and growth, with Mt Carbine and
Barruecopardo as the processing hubs for district-
scale operations in their proven tungsten regions.
Fourth, invest sensibly in production growth and a
lower cost base, of which the Mt Carbine crushing
expansion approved in June is a good example. Fifth,
selectively increase EQR’s participation in Western-
aligned tungsten supply chains where this strengthens
the Company’s strategic position, market access and
shareholder value.
Michael Nossal
Non-Executive Chair
EQ Resources Limited Annual Report 2026 1
The Board also believes that how we create value
matters as much as the value we create. EQR’s values
are ones I am comfortable standing behind: act
safe and feel safe, tread lightly, lead with integrity,
embrace difference, dig deep and buddy up. The
Board is aligned on ensuring that these values set
the expectations for how we treat our people, our
communities and the environment, and they will guide
the Company into the next phase of its development.
Further to my appointment in March, Board renewal
has continued. Stephen Layton stepped down on 31
July 2026 after more than eight years as a Director,
a period that took in the redevelopment of Mt
Carbine, the acquisition of Barruecopardo and the
recapitalisation. I thank Stephen sincerely for his
contribution, particularly noting the difficult times that
his tenure included. We have since welcomed Nicole
Brook and Taki Dermedgoglou as Non-Executive
Directors. I am also pleased that Stephen Weir will
continue as an independent Non-Executive Director
and Chair of the Audit and Risk Committee. The
Board now has a strong and diverse mix of skills and
experience, well-suited to supporting the Company
through our next phase of transformation.
Looking ahead, FY2027 offers an opportunity the
Company has not had before: higher-grade ore
accessible at both mines, a growth project in execution,
a sound balance sheet and a price environment that
rewards production. The Board’s expectations are
clear: a strong financial result that takes full advantage
of the market environment; targeted growth, delivered
safely and within our means; and systems, processes
and governance that keep developing to the standard
of an established mid-tier mining company, as we are
determined that EQR is becoming.
Finally, a sincere thank you to our shareholders,
because this year belongs to you more than any. You
stayed with the Company through the hard times, and
you are now starting to see the reward for that support.
An enormous thank you to Craig, his leadership team
and the dedicated employees at our two mines,
without whose tremendous efforts, the outcome this
year may have been quite different. My thanks also to
my fellow Directors for their counsel, our communities,
host governments, industry bodies, customers and
all our stakeholders. I am confident that your efforts
and patience will we well rewarded by the Company’s
bright outlook.
Michael Nossal
Non-Executive Chair
EQ Resources Ltd
Non-Executive
Chair’s Address continued
2 EQ Resources Limited Annual Report 2026
EQ Resources Limited Annual Report 2026 3
Managing Director’s
Address
Dear Fellow Shareholders,
FY2026 was a defining year for EQ Resources –
and, I will say plainly, a difficult one. We began the
financial year confronting acute liquidity and solvency
challenges that threatened the very continuity of the
business. We end it recapitalised, profitable, cash
generative and with the strongest balance sheet in the
Company’s history. Having stepped into the Managing
Director role on 1 October 2025, in the midst of that
most challenging period, I am proud of what our
people achieved in the twelve months to 30 June
2026 – and clear-eyed about what we must do better.
Restoring the balance sheet
The first half of the year was dominated by the
recapitalisation of the Company. Through a series of
placements, we raised A$56.5 million in new equity to
settle outstanding creditors, reduce debt and restore
working capital, and settled a further A$25.8 million of
debt through the issue of shares. We received A$23.5
million from the exercise of options associated with
FY2025 raisings, and we refinanced €15 million of
external debt in Spain with Traxys Europe S.A. over a
three-year term at EURIBOR plus a margin of 5.5%.
The results of that work are evident throughout this
report. The Company recorded a statutory net profit
after tax of A$7.1 million (FY2025: loss of A$39.2
million) and EBITDA of A$50.6 million (FY2025:
negative A$29.7 million). At 30 June 2026 we held
A$28.2 million in cash (FY2025: A$1.9 million) and a
net working capital surplus of A$16.2 million, against
a restated deficit of A$96.8 million a year earlier.
Most importantly, the financial statements in this
Craig Bradshaw
Managing Director
report carry an unmodified audit opinion: the going
concern qualification that attached to our previous
accounts no longer applies. The liquidity and solvency
challenges that defined the start of FY2026 are now
well behind us.
That outcome was only possible because our
shareholders backed the Company when it mattered
most. The recapitalisation came at a real cost – shares
on issue increased from 2.7 billion to 5.1 billion – and
we do not take that support lightly. Our obligation
now is to convert a repaired balance sheet into
sustained returns.
Safety
I must be equally direct about safety: our performance
this year was well short of acceptable, and it will
be a core focus of management in FY2027. At
Barruecopardo, the lost time injury frequency rate
improved from 22.5 to 15.8, a step in the right direction
but still too high. At Mt Carbine, the LTIFR deteriorated
from 36.6 to 43 – a result that is simply not good
enough, despite significant effort and investment from
management during the year.
We have not waited for this report to act. Independent
safety audits were completed at both operations during
the second half, actions arising are well underway, and
a new safety manager joins the Mt Carbine leadership
team in the first quarter of FY2027. Structured training,
toolbox engagement and comprehensive drug and
alcohol testing continue across both sites. Nothing we
mine is worth an injury, and the Board and I expect a
step change in performance in the year ahead.
4 EQ Resources Limited Annual Report 2026
Operations and weather
Group production for the year was 118,946 mtu of
WO₃ (FY2025: 167,805 mtu), with Barruecopardo
contributing 90,666 mtu and Mt Carbine 28,280 mtu.
The shortfall against the prior year was overwhelmingly
weather-driven, and the pattern was almost cruelly
symmetrical across our two hemispheres.
At Mt Carbine, insufficient water leading into the
end of the December 2025 quarter constrained
processing, before cyclone-related weather systems
through the wet season disrupted mining, blast
cadence and production in the March 2026 quarter.
At Barruecopardo, a 1-in-50-year rainfall event – the
wettest start to a year in Salamanca in some five
decades – flooded the southern pit and significantly
curtailed production through the March and June
2026 quarters, forcing mining into lower-grade areas
at a higher strip ratio.
These events have taught us a clear lesson, and we
will not rely on the weather being kinder next year. In
future years we will mitigate this risk by building ROM
stockpiles ahead of the wet seasons at both operations,
ensuring the processing plants can continue to run at
capacity when pit access is restricted.
I am pleased to report that both operations exited
the year strongly. At Mt Carbine, first access to the
higher-grade Iolanthe vein was achieved in March
2026 following the removal of 1.6 million tonnes
of overburden from the Southern Highwall, and
June quarter production rose 176% to 13,050 mtu
– the operation’s best quarter in over two years. At
Barruecopardo, the higher-grade southern ore body
was re-accessed in the first week of July 2026 following
an extensive dewatering effort. The June 2026 quarter
delivered record group revenue of A$79 million and
record operating cash flow, momentum we carry
into FY2027.
A transformed tungsten market
Our recovery has coincided with an extraordinary
shift in the tungsten market. The Fastmarkets APT
benchmark rose from around US$350/mtu in March
2025 to approximately US$2,900/mtu by the end
of June 2026, driven by Chinese export restrictions
and surging strategic demand for secure, Western-
sourced supply. As a leading tungsten producer in the
Western world, with long-term offtake agreements at
both operations, EQ Resources is exceptionally well
placed to benefit – but only if we produce. That is why
the operational discipline, weather resilience and safety
improvement described above matter so much.
Investing in growth
With the balance sheet restored, we returned to
growth in the second half. In June 2026 the Board
approved the A$39 million Mt Carbine Expansion
Project, which will double crushing capacity from
approximately 1 Mtpa to 2 Mtpa and automate the
crushing, screening, ore sorting and product handling
circuits, with commissioning expected to commence
in the March 2027 quarter. Resource drilling programs
are underway at both operations – approximately
12,155 metres at Barruecopardo and 7,700 metres at
Mt Carbine – supporting resource and reserve updates
in late 2026, and a 12,000-metre program at Wolfram
Camp commences in the second quarter of FY2027.
We also materially expanded our regional footprint,
lifting our tenement holdings around Mt Carbine from
783 km² to 1,136 km², with a further 824 km² under
application, through the acquisition of the Hodgkinson
tenement package from Sunshine Metals and of
Aus Critical Minerals and TTTP1, which brought with
them the mining licence for Mt White. Together these
transactions underpin our hub-and-spoke strategy,
positioning Mt Carbine as the central processing
hub of a district-scale tungsten province in Far
North Queensland.
Outlook and thanks
FY2027 begins with the higher-grade zones open in
both pits, a strengthened balance sheet, a A$39 million
growth project in execution and a tungsten price
environment unlike any in living memory. Our priorities
are unambiguous: a step change in safety performance,
weather-resilient operations underpinned by ROM
stockpiling, delivery of the Mt Carbine Expansion
Project, and continued growth in resources and
reserves across both districts.
To our employees and contractors in Queensland and
Salamanca, who worked through floods, cyclones
and considerable uncertainty with resilience and
professionalism – thank you. To my Board colleagues,
thank you for your counsel through a demanding
year. And to our shareholders, who stood by the
Company through its most testing period, thank you
for your patience and support. FY2026 asked a great
deal of everyone associated with EQ Resources. I am
confident the foundations laid this year will reward
that faith.
Yours sincerely,
Craig Bradshaw
Managing Director
EQ Resources Limited Annual Report 2026 5
EQ Resources Limited (EQR or the Company) is building a connected Western tungsten platform, anchored by
two producing mines in Australia and Spain and supported by long-term offtake, customer and strategic partner
relationships.
Barruecopardo Mine is the largest tungsten mine in Europe, comprising an open pit and a modern processing
plant that combines ore sorting and gravity separation. The Company holds eight adjacent exploration tenements
supporting future growth. Concentrate from Barruecopardo is sold under long-term volume-based agreements
referencing the Fastmarkets Tungsten APT 88.5% WO3
Rotterdam CIF price for the month of shipment.
Mt Carbine, on the Mulligan Highway northwest of Cairns, was historically one of the world's major tungsten mines
and has been progressively redeveloped - initially through the processing of historical stockpiles and now through
open pit mining of the primary orebody. Ore is upgraded using two ore sorters ahead of a gravity circuit producing
a tungsten concentrate for export. The Company holds significant exploration tenements in the region including
Wolfram Camp and the mining licence for Mt White. Concentrate from Mt Carbine is sold under a long-term
volume-based agreement referencing the Fastmarkets Tungsten APT 88.5% WO3
Rotterdam CIF price for the
month prior to shipment.
About EQ Resources Limited
6 EQ Resources Limited Annual Report 2026
Financial Review
A$28.2m
Cash on hand
(FY25: A$1.9 million)
A$50.6m
EBITDA
(FY25: negative A$9.5 million)
A$154m
Net Assets
(FY25: A$36.3 million)
Key Performance Indicators
EQ Resources Limited Annual Report 2026 7
Financial Review
Financial Performance and Position
The Company reports a statutory net profit after tax of A$7.1 million for the year ended 30 June 2026, compared to
a statutory net loss after tax of A$39.2 million as at 30 June 2025. EBITDA for the year was A$50.6 million, compared
to a negative A$29.7 million in FY2025.
At 30 June 2026, the Company held A$28.2 million (FY2025: A$1.9 million) of cash on hand and had a net working
capital surplus of A$16.2 million (FY2025: restated deficit of A$96.8 million).
Year ended Measure 2026 2025 2024 2023 2022
Net profit / (loss) after tax A$’000 7,113 (39,228) (14,425) (3,717) (6,063)
Net assets A$’000 154,268 36,287 44,330 16,305 14,317
Cash and cash equivalents A$’000 28,180 1,874 3,490 5,336 1,723
Cash flows from operating
activities
A$’000 (5,595) (16,918) (12,704) (1,393) (3,113)
EBITDA A$’000 50,576 (9,513) (5,169) (829) (4,478)
Share price at 30 June A$ 0.290 0.040 0.048 0.070 0.047
Basic earnings / (loss) per share Cents 0.18 (1.70) (0.13) (0.26) (0.45)
Funding
Primary focus during year was to recapitalise the Company and refinance external financing facilities. Key actions
completed during the year were as follows:
− Raising A$56.5 million in the first half of the year to settle outstanding creditors, reduce debt and provide
working capital to progress Company objectives.
− Settling A$25.8 million of debt with the issuance of shares in parallel to the capital raises performed in the first
half of the year.
− Refinancing €15 million of external debt over a three-year period with an interest rate of EURIBOR plus a margin
of 5.5% with Traxys Europe S.A.
− Receiving A$23.5 million from the exercise of options associated with FY2025 capital raising activity.
Shares on Issue
Due to the recapitalisation of the Company, issued capital increased to A$198.3 million (FY2025: A$93.5 million, with
ordinary shares on issue increasing from 2,727,672,193 to 5,115,488,534).
8 EQ Resources Limited Annual Report 2026
Review of Operations
Barruecopardo Mine (Spain)
15.8
LTIFR per million hours worked
for the year (FY25: 22.5)
A$16.3m
of operating cash flow was
generated during the year
(FY25: A$1.7 million)
WO3
in concentrate was
produced (FY25: 119,023 mtu)
90,666 mtu
Key Performance Indicators
EQ Resources Limited Annual Report 2026 9
The key performance metrics for the Barruecopardo Mine are tabulated below:
Barruecopardo Mine UoM 2026 2025 % Change
Safety performance
LTIFR Freq. 15.8 22.5 31%
Operational performance
Material blasted t 9,208,641 7,040,148 31%
Total tonnes mined t 8,603,184 7,016,943 23%
Ore mined t 1,138,272 1,344,365 (15%)
Waste mined t 7,464,912 5,672,578 32%
Strip ratio W:O 6.6 : 1 4.2 : 1 (57%)
Crushing plant feed t 1,674,956 1,445,453 16%
Ore sorter plant feed t 635,722 455,102 40%
Sorter concentrate produced t 121,651 86,575 41%
Gravity plant feed t 925,279 904,599 2%
Gravity plant feed grade % 0.19% 0.26% (27%)
Recovery % 55% 57% (4%)
WO3
produced mtu 90,666 119,023 (24%)
WO3
sold mtu 89,087 116,586 (24%)
Financial performance
Average realised price US$/mtu 851 259 228%
Nominal cash cost of production US$/mtu 357 229 (56%)
Operating and Financial Review continued
Health and Safety
Efforts continued to build a proactive safety culture
with ongoing weekly training being delivered across
the operation with ongoing alcohol and drug testing
for persons entering site.
This included external training on several critical
activities such as working at heights, hot works and the
risk of respirable crystalline silica.
The Company also commissioned independent
assessments of its safety culture, policies and
procedures continuing its ISO 45001 (safety) and ISO
14001 (environment) certifications. An independent
risk assessment was conducted in April 2026.
Mining
The mining team performed exceptionally well during
the year despite the 1-in-50-year rain event during
the March quarter. Material moved was significantly
greater than FY2025 despite the challenges created by
the event.
Unfortunately, due to the rain event, the team operated
in a lower grade area of the pit than anticipated leading
to a substantially higher strip ratio and a lower feed
grade for the year.
The higher-grade ore body was re-accessed in the first
week of July 2026.
Processing
Processing performance at Barruecopardo in FY2026
reflected the year’s mining disruption, with output
declining through the middle of the year before a
partial recovery into year-end.
Across FY2026, the site crushed approximately 1.67
million tonnes of ore, sorted approximately 636,000
tonnes through its ore sorting circuit, and processed
approximately 925,000 tonnes through the wet plant,
producing 90,666 mtu of WO₃ in concentrate for the
year at an average recovery of 55.3%.
10 EQ Resources Limited Annual Report 2026
Resource and Reserve Growth Program
Barruecopardo advanced a significant resource definition drilling programme during the final quarter of FY2026,
aimed at strengthening confidence in the existing geological model and testing the potential for resource growth
at depth.
The initial programme comprises 36 diamond drill holes for a total of approximately 12,155 metres, concentrated
primarily in the eastern area of the open pit. Of the 36 holes, 16 are infill holes designed to improve confidence in the
existing geological model, while the remaining 20 are targeting the deeper parts of the deposit and northern and
southern extensions to assess the potential for mineral resource expansion.
Geotechnical logging is being undertaken alongside geological logging across the programme, to build a stronger
understanding of rock mass conditions ahead of future mine design work.
Annual Mineral Resources Statement
Mineral Resources as at 30 June 2026 Mineral Resources as at 30 June 20251
Orebody
JORC Code
Category
Tonnes
(Mt)
Grade
(% WO3
)
WO3
(mtu)
Tonnes
(Mt)
Grade
(% WO3
)
WO3
(mtu)
In-Situ Measured 6.85 0.177 1,214,272 10.05 0.191 1,920,400
Indicated 9.52 0.177 1,682,554 10.46 0.174 1,820,000
Inferred 3.85 0.259 997,546 3.86 0.259 999,300
Subtotal 20.22 0.193 3,894,372 24.37 0.195 4,739,700
Annual Ore Reserves Statement
Ore Reserves as at 30 June 2026 Ore Reserves as at 30 June 2025
JORC Code Category
Tonnes
(Mt)
WO3
(%)
Contained
WO3
(mtu)
Tonnes
(Mt)
WO3
(%)
Contained
WO3
(mtu)
Open Cut - Proved 2.40 0.14 329,842 5.69 0.152 865,037
Open Cut - Probable 9.21 0.14 1,254,807 3.10 0.145 448,982
Open Cut - Total 11.61 0.14 1,584,649 8.80 0.156 1,314,019
Ore Stockpile - Proved 0.05 0.10 5,048 0.24 0.173 41,589
Ore Stockpile - Total 0.05 0.10 5,048 0.24 0.173 41,589
Open Cut & Ore Stockpile - Total 11.66 0.14% 1,589,697 9.04 0.150% 1,355,608
Marginal Stockpile - Proved 0.18 0.05 9,155
Total Including Marginal
Stockpile 11.84 0.14 1,598,852
Scalping Stockpile - Proved 0.32 0.06 18,652
Total Ore Reserve 12.16 0.13 1,617,504 9.04 0.150 1,355,608
Notes:
1 The Mineral Resource as at 30 June 2025 is as described in ASX Announcement 4 November 2024. The movement in the Barruecopardo Mineral
Resource and Ore Reserve estimates between 30 June 2025 and 30 June 2026 is due to mining depletion only. There has been no material change
to the Mineral Resource or Ore Reserve models, or to the assumptions and technical parameters underpinning the estimates, other than depletion
arising from mining and processing during the period.
2 Totals may not add up due to rounding.
3 The tonnes depleted for the actual mining have been calculated by regular topographic surveys, to which density factors have been applied to derive
tonnes. These density factors are the same as described in the report for the Resource Estimate as at 30th of June 2025.
4 The Ore Reserve is the economically mineable part of the Measured and Indicated Mineral Resource. It includes allowance for ore losses and dilution
during mining extraction.
5 The Ore Reserve as at 30 June 2026 includes 0.5tonnes of proved stockpiles, which were not separately identified in the 30 June 2025 comparison.
Stockpiles have been estimated by Saloro from topographical survey, and assigning grades derived from the operational grade control and production
estimates.
6 The Company ensures that the Mineral Resource and Ore Reserve estimates quoted are subject to governance arrangements and internal controls at
both a site level and at the corporate level. Mineral Resources and Ore Reserves are prepared and reported in accordance with the JORC Code 2012,
using industry standard techniques and internal guidelines for the estimation and reporting of Ore Reserves and Mineral Resources. The Mineral
Resource and Ore Reserve statements included in the Annual Report were reviewed by the Competent Persons prior to inclusion.
EQ Resources Limited Annual Report 2026 11
Competent Person’s Statement - Barruecopardo Mine
Mineral Resources
The information in this report is extracted from the statement named “Barruecopardo Scheelite Mine - Annual
Mineral Resource Statement June 2026” and has been prepared by Mr Jörg Pohl, Consultant to Saloro and
Independent Resource Geologist. Mr Pohl has contributed to previous Resource estimates for Barruecopardo and
has provided professional services to the operation over many years. Mr Pohl is a qualified Geologist (MSc Geology,
Universität Freiburg i.Br., Germany), has over 25 years of experience, is a member of the European Federation of
Geologists (EFG) and holds the title EurGeol (#1728). Mr Pohl has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and the activity being undertaken to qualify as a Competent
Person as defined in the JORC Code 2012.
Mr Pohl has been working for Saloro during the last 6 years by providing consulting expertise in resource estimation,
delivering resource and grade control block models. Mr Pohl has no material interest or entitlement, direct or
indirect, in the securities of EQR or any associated companies.
Mr Pohl consents to the inclusion in the release of the matters based on his information in the form and context in
which it appears.
Ore Reserves
The information in this report is extracted from the statement named “Barruecopardo Scheelite Mine - Annual Ore
Reserves Statement June 2026” and has been prepared by Mr Jesús María Montero González, Principal Mining
Consultant and Director of Mining Sense Global SL. and reviewed by Mr Hugh Thompson.
Mr Montero is a qualified Mining Engineer (MSc Mining Eng., Universidad Politécnica de Madrid - Spain), has over
24 years of experience and is a member of the Australasian Institute of Mining and Metallurgy (AusIMM) FAusIMM
3111131. Mr Montero has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and the activity being undertaken to qualify as a Competent Person as defined in the JORC Code
2012. Mr Hugh Thompson is a FAusIMM and CP (mining), with AusIMM membership # of 111 543.
Mr Montero and the Mining Sense Global SL team have been working for Saloro during the last 7 years by providing
consulting expertise in mine design and mine schedule for medium and long term. Neither Mr Thompson, Mr
Montero or Mining Sense Global SL has any material interest or entitlement, direct or indirect, in the securities of EQ
Resources Limited or any associated companies.
Mr Montero and Mr Thompson consent to the inclusion in the release of the matters based on their information in
the form and context in which it appears.
Operating and Financial Review continued
12 EQ Resources Limited Annual Report 2026
Mt Carbine Operations (Australia)
43.0
LTIFR per million hours worked
for the year (FY25: 36.6)
(A$14.1m)
net operating cash outflow
(FY25: negative A$7.9 million)
WO3
in concentrate was
produced (FY25: 48,782 mtu)
28,280 mtu
Key Performance Indicators
EQ Resources Limited Annual Report 2026 13
The key performance metrics for the Mt Carbine Mine are tabulated below:
Mt Carbine UoM 2026 2025 % Change
Safety performance
LTIFR Freq. 43.0 36.6 (57%)
Operational performance
Material blasted t 2,834,951 1,441,502 97%
Total tonnes mined t 2,770,009 2,240,652 24%
Ore mined t 407,020 573,797 (29%)
Waste mined t 2,362,989 1,666,855 42%
Strip ratio W:O 5.8 : 1 2.9 : 1 (100%)
Crushing plant feed t 565,141 756,318 (25%)
Ore sorter plant feed t 366,199 462,105 (21%)
Sorter concentrate produced t 29,528 36,117 (18%)
Gravity plant feed t 226,771 238,031 (5%)
Gravity plant feed grade % 0.17% 0.24% (29%)
Recovery % 77% 83% (7%)
WO3
produced mtu 28,280 48,782 (42%)
WO3
sold mtu 28,588 50,040 (43%)
Financial performance
Average realised price US$/mtu 1,277 251 409%
Nominal cash cost of production US$/mtu 1,013 412 (146%)
Health and Safety
Despite significant effort from management, the safety
performance was disappointing at Mt Carbine.