EQR UPDATE TO 'EQR PROGRESSES REGIONAL TUNGSTEN HUB
STRATEGY’ ANNOUNCEMENT
EQ Resources Ltd is a global tungsten producer with mining activities in Australia and Spain.
EQ Resources Limited (“EQR” or “the Company”) advises that the ASX announcement
made on 13 June 2025, titled ‘EQR Progresses Regional Tungsten Hub Strategy’, was
released without the required JORC code information. An updated version of this
announcement follows with the inclusion of the JORC Code 2012 Table 1 as an appendix.
Released on authority of the Board by:
Oliver Kleinhempel
Executive Chairman
Further Enquiries:
Peter Taylor
Investor Relations
0412 036 231
peter@nwrcommunications.com.au
About the Company
EQ Resources Limited is a leading global tungsten mining company dedicated to sustainable mining and processing
practices. The Company is listed on the Australian Securities Exchange, with a focus on expanding its world-class
tungsten assets at Mt Carbine in North Queensland (Australia) and at Barruecopardo in the Salamanca Province (Spain).
The Company leverages advanced minerals processing technology and unexploited resources across multiple
jurisdictions, with the aim of being a globally leading supplier of the critical mineral, tungsten. The Company aims to
create shareholder value through the exploration and development of its current project portfolio whilst continuing to
evaluate corporate and exploration opportunities within the new economy and critical minerals sector globally.
Forward-looking Statements
This announcement may contain forward-looking statements. Forward-looking statements address future events and
conditions and therefore involve inherent risks and uncertainties. Actual results may differ materially from those currently
anticipated in such statements. Particular risks applicable to this announcement include risks associated with planned
production, including the ability of the Company to achieve its targeted production outline due to regulatory, technical or
economic factors. In addition, there are risks associated with estimates of resources, and there is no guarantee that a
resource will have demonstrated economic viability as necessary to be classified as a reserve. There is no guarantee that
additional exploration work will result in significant increases to resource estimates. Neither the Australian Securities
Exchange nor its Regulation Services Provider (as that term is defined in policies of the Australian Securities Exchange)
accepts responsibility for the adequacy or accuracy of this announcement.
Follow us:
REGISTERED OFFICE: Suite 2, Level 11, 385 Bourke Street, Melbourne, VIC 3000
PRINCIPAL PLACE OF BUSINESS: 6888 Mulligan Highway, Mt Carbine Qld 4871
POSTAL ADDRESS: PO Box 1496, Mareeba Qld 4880
ABN: 77 115 009 106 (ASX: EQR)
T: (07) 4094 3072 | F: (07) 4094 3036 | W: eqresources.com.au
resourcing the new economy for a better tomorrow
EQR PROGRESSES REGIONAL TUNGSTEN HUB STRATEGY –
PRELIMINARY XRT SORTING RESULTS AT WOLFRAM CAMP DELIVER
86% TUNGSTEN RECOVERY AND 16 TIMES UPGRADE
EQ Resources Ltd is a global tungsten producer with mining activities in Australia and Spain.
Highlights:
Wolfram Camp ore and waste stockpiles tested: two representative composite samples - WBS
Parrot (ore stockpile) and WBS Combined (waste composite) - were screened and X-ray sorted
to assess upgrade potential and recovery performance.
Strong tungsten upgrade from ore stockpile achieving 86% tungsten recovery from just 5-10%
of the original feed mass, demonstrating excellent de-bulking and upgrade potential.
Unlocking value in waste stockpiles with waste composite sample revealing 0.10% WO₃ head
grade, with 75% of contained tungsten in fines.
Advanced XRT Sorting validated through collaboration with testing delivered in partnership with
TOMRA Sorting Solutions and the University of Queensland’s Sustainable Minerals Institute and
supported by a $250,000 Queensland METS grant.
Preliminary results confirm the technical viability of surface stockpile reprocessing, leveraging
Mt Carbine’s success and working to establish a regional tungsten hub. These results
potentially provide a pathway to low-impact resource recovery through sensor-based sorting
technology that unlocks additional value from historical material.
EQ Resources Limited (the “Company” or “EQR”) is pleased to report preliminary results from composite
sample testing conducted at the Wolfram Camp Project in Far North Queensland. The testing program included
screening, sizing, assaying, and advanced X-Ray Technology (XRT) ore sorting, and was delivered in
collaboration with TOMRA Sorting Solutions’ technical team, and researchers from The University of
Queensland’s Sustainable Minerals Institute (SMI).
The trial forms part of a program supported by a A$250,000 grant from the Queensland METS Collaborative
Projects Fund and is conducted under an Exploration Permit for Minerals (EPM) granted to EQ Resources
through the Queensland Government’s Abandoned Mine Lands Program, as previously announced.
REGISTERED OFFICE: Suite 2, Level 11, 385 Bourke Street, Melbourne, VIC 3000
PRINCIPAL PLACE OF BUSINESS: 6888 Mulligan Highway, Mt Carbine Qld 4871
POSTAL ADDRESS: PO Box 1496, Mareeba Qld 4880
ABN: 77 115 009 106 (ASX: EQR)
T: (07) 4094 3072 | F: (07) 4094 3036 | W: eqresources.com.au
resourcing the new economy for a better tomorrow
Leveraging EQ Resources' Proven Success in Sorting Technology
EQR has been a leader in refining Tungsten XRT sorting technology at its Mt Carbine mine in Australia and
Saloro operations in Spain - providing valuable insights for the broader industry.
At Mt Carbine, EQR has implemented multiple TOMRA XRT ore sorters, achieving WO₃ recoveries exceeding
95%. Sorting technology has enabled mass yields of 10-12% from low-grade stockpiles, demonstrating the
power of pre-concentration strategies that optimize costs, energy use, and environmental impact. Mt Carbine
successfully re-started operations in 2020 by reprocessing historical tailings and low-grade stockpiles,
transforming over 12 million tonnes of previously uneconomic material into a viable resource through the
application of advanced sorting technology.
Similarly, at Saloro’s Barruecopardo mine, ongoing investments in XRT sorting have expanded processing
capacity by 50%, significantly improving tungsten separation efficiency. The introduction of a third XRT Ore
sorter is being installed and will increase recoveries and throughput, achieving +90% scheelite recovery, while
discarding 85-90% of host rock before final processing - leading to substantial operational savings.
Wolfram Camp Historic Stockpile Sample Testing
The two samples tested were:
WBS Parrot: A representative composite sample from the existing ore stockpile.
WBS Combined: A composite of three samples sourced from the historical waste stockpile.
These trials were designed to evaluate the grade distribution across size fractions for Tungsten (WO3) and
Molybdenum (Mo) and assess the effectiveness of XRT sorting in recovering tungsten and molybdenum from
surface stockpiles.
WBS Parrot (Ore Stockpile) - Strong Upgrade Potential Demonstrated
Head Grade: 0.09% WO₃ (728 ppm W) and 269 ppm Mo
There was no material in the oversize fraction (+65 mm) in the sample with the tungsten contained in
sortable size fractions:
o
o
o
-65mm to +26.5 mm: making up for 58% of the total mass, with a grade of 0.08% WO₃, for
51.6% of total W contained in the sample,
-26.5 to +6.7 mm: making up for 40.2% of the total mass, with a grade of 0.10% WO₃, for
41.6% of total W,
-6.7mm: the fine fraction, was less than 2% of the sample by mass but showed a grade of
0.36% WO₃, for 6.5% of total W
resourcing the new economy for a better tomorrow
Figure above left: represent Tungsten distribution (%) and mass distribution (%) for each size fraction in the WBS Parrot Stockpile.
Figure above right: represent Molybdenum distribution (%) and mass distribution (%) for each size fraction.
XRT Ore Sorter Response:
Excellent response in both sorter size fractions, with 86% tungsten recovery.
Significant grade increase:
o -65mm to +26.5 mm: from 0.08% WO₃ to 0.67% WO₃
o -26.5 to +6.7 mm: from 0.10% WO₃ to 1.59% WO₃, a x16 upgrade.
o Waste grade of 0.01% WO₃ in both size fraction
Mass yields:
o -65mm to +26.5 mm: >10%
o -26.5 to +6.7 mm: >5%
Molybdenum was upgraded but with modest recoveries of 20–35% depending on size fraction.
These results highlight the sorter’s ability to efficiently de-bulk tungsten-bearing ore, with 86% of the total
contained tungsten recovered in just 5-10% of the original feed mass, demonstrating a significant increase and
reduction in downstream processing volume.
WBS Combined (Waste Stockpile Composite) - Tungsten in Fines Unlocks Additional Value
Head Grade: 0.10% WO₃ (772 ppm W) and 199 ppm Mo
Approximately 12% of the sample mass in the oversize fraction (+65 mm) remains unassayed and
was assumed to carry no grade for this analysis:
o
o
o
-65 +26.5 mm: making up to 24.6% of the total mass, with a grade of 0.07% WO₃, for 18% of
total W
-26.5 +6.7 mm: making up 18.4% of the total mass, with a grade of 0.03% WO₃, for 6% of
total W
-6.7mm: the fines represented 45% of the total mass, with a grade of 0.16% WO₃, for 75% of
total W in the sample.
resourcing the new economy for a better tomorrow
Figure above left: represent Tungsten distribution (%) and mass distribution (%) for each size fraction in the WBS Combined Stockpile.
Figure above right: represent Molybdenum distribution (%) and mass distribution (%) for each size fraction.
XRT Ore Sorter Response:
-65 + 25.6 mm Size fraction:
o 76% W recovery, 28% Mo recovery
o Grade upgrade from 0.07% WO₃ to 0.45% WO₃
-26.5 mm +6.7mm Size fraction:
o W and Mo upgraded 14x and 7x respectively
o 40% W recovery, 20% Mo recovery
o Grade upgrade from 0.03% WO₃ to 0.46% WO₃
Waste grade of 0.02% WO₃ in both size fraction
Mass yields:
o -65mm to +26.5 mm: >12%
o -26.5 to +6.7 mm: >2%
Despite lower recoveries than WBS Parrot, the results on the Waste Stockpile indicate meaningful value in the
historical waste material, especially in the fine fractions, where tungsten can be easily recovered using gravity
separation without the need for additional crushing or sorting.
EQR Executive Chairman, Oliver Kleinhempel, commented: “These preliminary results highlight the technical
potential to unlock value from historical stockpiles at Wolfram Camp using modern sorting techniques. The
strong tungsten upgrade from the Parrot stockpile and meaningful recoveries from the waste composite
reinforce the viability of this low-impact approach to resource recovery and offers exciting upside as we refine
our processing strategy. We look forward to completing the technical review and progressing to the next phase
of evaluation.”
EQR is evaluating the potential to leverage its existing infrastructure to establish a regional tungsten hub. The
strategy aims to maximise operational synergies, reduce capital intensity, and support regional employment
by providing opportunities for the local workforce, building on successful upskilling and training programs the
Company has already implemented.
Further assay certification and interpretation of results are underway with the next steps including further
sample testing with the XRT ore sorter at Mt Carbine to assess in-situ sortability potential, with results to be
integrated into production and stockpile evaluation. The Company will continue to update the market as the
project progresses.
Appendix 1 provides the required JORC code information related to this announcement.
resourcing the new economy for a better tomorrow
Released on authority of the Board by:
Oliver Kleinhempel
Executive Chairman
Further Enquiries:
Peter Taylor
Investor Relations
0412 036 231
peter@nwrcommunications.com.au
About the Company
EQ Resources Limited is a leading tungsten mining company dedicated to sustainable mining and processing practices.
The Company is listed on the Australian Securities Exchange, with a focus on expanding its world-class tungsten assets
at Mt Carbine in North Queensland (Australia) and at Barruecopardo in the Salamanca Province (Spain). The Company
leverages advanced minerals processing technology and unexploited resources across multiple jurisdictions, with the aim
of being a globally leading supplier of the critical mineral, tungsten. The Company aims to create shareholder value through
the exploration and development of its current project portfolio whilst continuing to evaluate corporate and exploration
opportunities within the new economy and critical minerals sector globally.
Competent Person Statement
The technical information in this announcement that relates to metallurgical test work and ore sorting is based on, and
fairly represents, information compiled by Mr Kevin MacNeill, who is a Member of the Australasian Institute of Mining and
Metallurgy (AusIMM). Mr MacNeill is the Chief Technical Officer of EQ Resources Limited and is not considered
“independent” for the purposes of the Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves (JORC Code, 2012 Edition).
Mr MacNeill has over 15 years of experience in mineral processing, with particular expertise in the application and
optimisation of sensor-based ore sorting technology. He has sufficient experience which is relevant to the style of
mineralisation and type of deposit under consideration, and to the metallurgical test work being reported, to qualify as a
Competent Person as defined in the JORC Code (2012 Edition). Mr MacNeill consents to the inclusion in the report of
the matters based on his information in the form and context in which it appears.
Forward-looking Statements
This announcement may contain forward-looking statements. Forward-looking statements address future events and
conditions and therefore involve inherent risks and uncertainties. Actual results may differ materially from those currently
anticipated in such statements. Particular risks applicable to this announcement include risks associated with planned
production, including the ability of the Company to achieve its targeted production outline due to regulatory, technical or
economic factors. In addition, there are risks associated with estimates of resources, and there is no guarantee that a
resource will have demonstrated economic viability as necessary to be classified as a reserve. There is no guarantee that
additional exploration work will result in significant increases to resource estimates. Neither the Australian Securities
Exchange nor its Regulation Services Provider (as that term is defined in policies of the Australian Securities Exchange)
accepts responsibility for the adequacy or accuracy of this announcement.
Follow us:
resourcing the new economy for a better tomorrow
APPENDIX A - JORC CODE, 2012 EDITION In Situ Resource _ Table 1
Section 1 - Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria
Sampling
technique
s
JORC Code Explanation
Nature and quality of sampling
(e.g.- cut channels, random
chips, or specific specialised
industry standard measurement
tools appropriate to the
minerals under investigation,
such as down hole gamma
sondes, or handheld XRF
instruments,
etc).
These
examples should not be taken
as limiting the broad meaning of
sampling.
Include reference to measures
taken to ensure sample
representivity
and
the
appropriate calibration of any
measurement tools or systems
used.
Aspects of the determination of
mineralisation that are Material
to the Public Report. In cases
where ‘industry standard’ work
has been done this would be
relatively simple (e.g.- ‘reverse
circulation drilling was used to
obtain 1 m samples from which
3 kg was pulverised to produce
a 30 g charge for fire assay’). In
other cases, more explanation
may be required, such as where
there is coarse gold that has
inherent sampling problems.
Unusual
commodities
or
mineralisation types (e.g.submarine
nodules)
may
warrant disclosure of detailed
information.
Details
Sampling was undertaken at the Wolfram Camp Project in Far North
Queensland to assess the potential for tungsten recovery from historical
surface stockpiles using sensor-based ore sorting technology. This was
done to understand the technical viability of using Sensor-based sorting to
extract value bearing minerals from stockpiled materials and historic ores
in the Wolfram Camp Area.
Two distinct stockpile domains were sampled:
WBS Parrot: representing a mineralised ore stockpile; and
WBS Combined: a composite sample assembled from three
locations within the historical waste stockpile.
Sampling was conducted using an excavator and front-end loader to
extract representative samples from surface exposures. Material was
selectively taken from multiple vertical and lateral positions within each
domain to capture expected lithological and mineralogical variability.
Approximately 1–2 tonnes per sample were collected, consistent with
pilot-scale ore sorting requirements.
Material was screened at site to remove oversize fractions (greater than
65 mm) and fines (less than 6.7 mm), aligning with TOMRA XRT sorter
specifications. The target sortable size fractions (6.7 mm to 65 mm) were
packaged in sealed 0.5–1 tonne big bags and clearly labelled for
transport and tracking. Internal labels and external markings were used to
preserve sample identity during shipment.
Samples were shipped under strict chain-of-custody protocols to The
University of Queensland’s Sustainable Minerals Institute (SMI) for
analytical characterisation and further processing, with preliminary XRT
ore sorting trials conducted in partnership with TOMRA Sorting Solutions.
All sampling and handling procedures followed industry best practice, and
a Sample Hazard Advice (SHA) form was submitted to SMI to confirm the
absence of asbestos, radioactive materials, or significant handling risks.
Analytical assays were undertaken by ALS and SMI using XRF and ICPMS methods, with QAQC protocols including blanks and duplicates.
This sampling methodology is considered appropriate for preliminary
metallurgical and sensor-based sorting test work and provides a robust
basis for evaluating upgrade potential in surface stockpile material
containing tungsten (WO₃), molybdenum (Mo), and associated byproducts.
resourcing the new economy for a better tomorrow
Criteria
Drilling
techniques
Drill sample
recovery
JORC Code Explanation
Drill type (e.g.- core, reverse
circulation, open-hole hammer,
rotary air blast, auger, Bangka,
sonic, etc) and details (e.g.- core
diameter, triple or standard tube,
depth of diamond tails, facesampling bit or other type,
whether core is oriented and if so,
by what method, etc).
Method of recording and assessing
core and chip sample recoveries
and results assessed.
Measures taken to maximise sample
recovery
and
ensure
representative nature of the
samples.
Whether a relationship exists
between sample recovery and
grade and whether sample bias
may have occurred due to
preferential
loss/gain
of
fine/coarse material.
Details
No drilling was undertaken for the purposes of the sampling program
reported. All samples were obtained from surface stockpiles using
mechanical excavation methods, including excavators and front-end
loaders. These techniques were used to collect samples directly from
exposed stockpile faces and benches.
Sampling focused on capturing material representative of the different
lithological domains and particle size distributions within the stockpiles,
particularly targeting sortable size fractions for XRT sorting test work.
Given the nature of the surface stockpiles and the objective of testing preconcentration potential through ore sorting, traditional subsurface drilling
was not required or applicable to this phase of investigation.
Not applicable – no drilling was undertaken.
Samples were collected from surface stockpiles using mechanical
excavation methods. Each big bag was weighed at the time of collection
to monitor consistency in sample mass and to support later metallurgical
balancing. Visual inspection was conducted during loading to assess
material consistency and ensure representativeness across various
lithological zones and size fractions within the stockpiles.
Although traditional core or chip sample recovery metrics are not
applicable, the size fraction analysis revealed that in the “WBS Combined
(Waste Stockpile Composite) – Tungsten in Fines Unlocks Additional
Value” a notable concentration of tungsten in the fine fraction (-6.7 mm).
In the WBS Combined (waste stockpile) sample, this fraction accounted
for 45% of the sample mass but contained 75% of the total tungsten
(grade: 0.16% WO₃). As this fine material was not included in the XRT
sorting trials, it is acknowledged that this introduces a potential bias in the
economic viability of sensor based sorting of the Stockpiles and that
further sampling would be required to determine economic viability of the
stockpile overall.
Efforts were made to minimise handling loss of fines during sampling,
transport, and screening, but the disproportionate grade in the fine
fraction is a material consideration in interpreting recovery results and
overall sample representativeness.
Logging
Whether core and chip samples have
been
geologically
and
geotechnically
logged to a level of detail to
support
appropriate
Mineral
Resource estimation, mining
studies and metallurgical studies.
Whether logging is qualitative or
quantitative in nature. Core (or
costean, channel, etc) photography.
The total length and percentage of
the relevant intersections logged.
All samples were logged visually during collection to document key
geological and physical characteristics. Logging focused on identifying
lithology, degree of oxidation, mineralisation style, colour, and textural
variations across each sample. Observations were recorded during the
excavation and handling process to support interpretation of the source
material and to guide the metallurgical sorting and assay program.
While no drillhole geological logging was applicable, field personnel
conducted logging at the time of excavation to assist in classifying each
sample's origin—particularly distinguishing material from mineralised ore
stockpiles (WBS Parrot) versus historic waste dumps (WBS Combined).
This logging was used in conjunction with size fraction screening and
assay data to support metallurgical domain analysis and validate the
representativeness of samples submitted for XRT sorting and chemical
analysis.
Photographic records and field notes were maintained as part of the
sample tracking and verification process.
Subsampling
techniques
and sample
preparation
If core, whether cut or sawn and
whether quarter, half or all core
taken.
If non-core, whether riffled, tube
sampled, rotary split, etc and
whether sampled wet or dry.
Following collection, samples were screened on-site to remove oversize
material (>65 mm) and fines (<6.7 mm), targeting the sortable fractions
suitable for XRT ore sorting trials (6.7–65 mm). This size-based subsampling was performed using mobile screening equipment to ensure
consistency across samples and reduce size-related biases in sorter
performance testing.
Sub-samples were prepared from each sample for assay and
characterisation work. This included drying, crushing (where applicable),
and riffle or rotary splitting to produce representative laboratory samples.
Final assay charges ranged from 1 to 2 kg and were submitted to
accredited laboratories for chemical analysis.
Samples were analysed using X-Ray Fluorescence (XRF) and Inductively
resourcing the new economy for a better tomorrow
Coupled Plasma Mass Spectrometry (ICP-MS) methods. Quality control
protocols included the insertion of certified reference materials, field
duplicates, and blanks at a nominal rate of 1 in 20. These procedures
were used to monitor assay precision and accuracy.
Sample preparation for metallurgical trials and XRT sorter testing was
conducted in partnership with the University of Queensland’s Sustainable
Minerals Institute. All handling and sub-sampling followed documented
procedures to ensure the integrity of test results and their
representativeness relative to the original samples.
Quality of
assay data
and
laboratory
tests
The
nature,
quality
and
appropriateness of the assaying
and laboratory procedures used
and whether the technique is
considered partial or total.
For
geophysical
tools,
spectrometers, handheld XRF
instruments, etc, the parameters
used in determining the analysis
including instrument make and
model, reading times, calibrations
factors
applied
and
their
derivation, etc.
Nature of quality control procedures
adopted (e.g.- standards, blanks,
duplicates, external laboratory
checks) and whether acceptable
levels of accuracy (i.e. lack of
bias) and precision have been
established.
Assay analysis was conducted at accredited commercial laboratories
using industry-standard analytical techniques. Samples were analysed by
X-Ray Fluorescence (XRF) and Inductively Coupled Plasma Mass
Spectrometry (ICP-MS) to quantify elemental concentrations, including
tungsten (WO₃), molybdenum (Mo), bismuth (Bi), and associated
pathfinder elements.
Sample preparation included drying, crushing (if required), and
homogenisation prior to splitting. Analytical methods were selected for
their suitability in detecting low-level concentrations across a range of
mineralised and waste rock domains, and for their ability to support
metallurgical test work interpretation.
To ensure data quality, a comprehensive QAQC program was
implemented. This included:
Insertion of certified reference materials, field duplicates, and blank
samples at a minimum frequency of 1 in 20;
Cross-checks between original assay returns and expected
mineralogical associations observed during logging;
Internal laboratory standards and controls used as part of routine
commercial lab QAQC.
All assay data were reviewed and validated by EQR's geologists and
metallurgists. Results fell within acceptable limits for precision and
accuracy, with no material QAQC failures recorded during this stage of
the program. The analytical results were deemed appropriate to support
the metallurgical evaluation and grade distribution modelling of the
stockpiles.
Verification
of sampling
Location of
Data Points
The
verification
of
significant
intersections
by
either
independent
or
alternative
company personnel.
The use of twinned holes.
Documentation of primary data, data
entry
procedures,
data
verification,
data
storage
(physical
and
electronic)
protocols.
Discuss any adjustment to assay
data.
Accuracy and quality of surveys used
to locate drill holes (collar and
down- hole surveys), trenches,
mine
workings
and
other
locations
used
in
Mineral
Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
All assay results were subject to internal review and validation by EQR’s
senior geological and metallurgical personnel. Digital laboratory results
were cross-checked against sample submission records to ensure
accurate correlation between sample ID, location, and analytical data.
No twinned samples were collected, as the program involved surface
sampling rather than drilling. Verification of sample representativeness
relied on field observation during collection and subsequent confirmation
through assay results and physical characteristics (e.g. lithology, grain
size, and oxidation state).
Assay datasets were reviewed for consistency with expected
mineralisation signatures and interpreted in conjunction with size fraction
analysis and metallurgical sorting results. No material inconsistencies or
errors were identified, and the verification process supports the reliability
of the results for the intended metallurgical and sorting evaluation.
Stockpile boundaries at the Wolfram Camp site were surveyed using
differential GPS (DGPS) to produce high-accuracy spatial models for
volume estimation and sampling control.
Sample collection points within the stockpiles were recorded using
handheld GPS units with an approximate positional accuracy of ±3
metres. These coordinates were used to document the origin of each
sample and to support spatial reconciliation with lithological and
metallurgical domains.
No drill collars were recorded, as the sampling program was based
entirely on surface excavation from existing stockpiles. Surveyed
locations are adequate for the level of confidence required in this stage of
metallurgical and ore sorting test work.
resourcing the new economy for a better tomorrow
Data
spacing
and
distribution
Data spacing for reporting of
Exploration Results.
Whether the data spacing and
distribution
is
sufficient
to
establish the degree of geological
and grade continuity appropriate
for the Mineral Resource and Ore
Reserve estimation procedure(s)
and classifications applied.
Whether sample compositing has
been applied.
Samples were collected from surface stockpiles at approximately 10
metre intervals across the accessible footprint of each stockpile. This
spacing was designed to ensure spatial coverage of material variability
and to capture representative samples from different lithological and
mineralogical zones within each domain.
Three samples were composited to create the WBS Combined (waste
stockpile) sample, while a single, large sample was taken from the WBS
Parrot (ore stockpile). Sample locations were selected based on visual
differentiation of material types and targeted across multiple depths and
sections of the stockpile surface.
This spacing and sampling methodology is considered appropriate to
support Inferred-level confidence in stockpile grade variability