Investor Presentation - EurozHartleys Conference 18 March 2026
EQ RESOURCES LIMITED
A leading producer of tungsten – a critical and strategic
mineral
Disclaimer
Competent Person's Statement
• The information in this presentation relates to EQ Resources Ltd’s two principal operations — the Mt Carbine Tungsten Mine in Queensland, Australia, and the Barruecopardo Tungsten Mine in Salamanca, Spain — as well as to exploration
and Mineral Resource work undertaken across the group.
• Mt Carbine Operations (Australia)
The information relating to the Mt Carbine Mine, including exploration results, Mineral Resource and Ore Reserve estimates, and supporting technical data, is based on the outcomes of the Mt Carbine Bankable Feasibility Study Update
(May 2023), prepared by Optimal Mining Solutions Pty Ltd.
• The information was updated in EQ Resources’ Annual Report 2025 to reflect new geological, metallurgical, and operational work undertaken by Mr Tony Bainbridge. Mr Bainbridge, Member of the Australasian Institute of Mining and
Metallurgy (AusIMM No. 112770). Mr Bainbridge is engaged as a contractor to EQ Resources Ltd and is therefore not independent within the meaning of the JORC Code (2012). He has sufficient experience relevant to the style of
mineralisation, type of deposit, and activities being undertaken to qualify as a Competent Person as defined in the JORC Code (2012). Mr Bainbridge has verified and approved the data disclosed, including sampling, analytical, and test
results, and consents to the inclusion of this information in the form and context in which it appears. All material assumptions and technical parameters underpinning the updated estimates, as presented in the 2025 Annual Report and
subsequent market announcements, continue to apply and remain current.
• Barruecopardo Operations (Spain)
The information relating to the Barruecopardo Mine (Saloro S.L.U.) is based on, and fairly represents, information and supporting documentation compiled by independent consultant Mining Sense Global S.L. under the guidance of Mr
Hugh Thompson. Mr Thompson is a qualified Mining Engineer (B.Eng (Mining), Grad. Dip (Finance)) and a Fellow of the Australasian Institute of Mining and Metallurgy (FAusIMM CP Mining) with over 40 years of experience in the feasibility,
design, and operation of mining projects across Australia, Asia-Pacific, Africa, and South America. He has sufficient experience relevant to the style of mineralisation, deposit type, and activity being undertaken to qualify as a Competent
Person under the JORC Code (2012). Mr Thompson consents to the inclusion in this document of the matters based on his information in the form and context in which it appears. Neither Mr Thompson nor Mining Sense Global S.L. has any
material interest, direct or indirect, in the securities of EQ Resources Ltd or its related entities. Fees for the preparation of this information were provided on a time-and-materials basis only.
• EQ Resources Ltd confirms that it is not aware of any new information or data that materially affects the information included in the relevant market announcements, and that all material assumptions and technical parameters
underpinning the updated estimates continue to apply. The Company further confirms that the form and context in which each Competent Person’s findings are presented have not been materially modified from the information in which
they were originally reported.
General Disclaimer
• The material contained in this document is a presentation of general information about the Company’s activities current as at the date of this presentation. It is provided in summary and does not purport to be complete. You should not
rely upon it as advice for investment purposes, as it does not take into account your investment objectives, financial position or needs. These factors should be considered, with or without professional advice, when deciding if an investment
is appropriate.
• This document may contain forward-looking statements with respect to the financial condition, results of operations, and business strategy of the Company. These forward-looking statements are based on estimates, projections and
assumptions made by the Company about circumstances and events that have not yet taken place. Although the Company believes the forward-looking statements to be reasonable, they are not certain. Forward-looking statements
involve known and unknown risks, uncertainties and other factors that are in some cases beyond the Company’s control, and which may cause actual results, performance or achievements to differ materially from those expressed or
implied by the forward-looking statements (and from past results).
• The Company makes no representation or warranty as to the accuracy of any forward-looking statements in this document and undue reliance should not be placed upon such statements.
• The Company confirms all material assumptions underpinning the production targets and forecast financial information remain applicable and have not materially changed.
• Forward-looking statements may be identified by words such as “aim”, “anticipate”, “assume”, “continue”, “could”, “estimate”, “expect”, “intend”, “may”, “plan”, “predict”, “should”, “will”, or “would” or the negative of such terms or other similar
expressions that are predictions of or otherwise indicate future events or trends. The forward-looking statements included in this document speak only as of the date of this document. Except as required by law (including the ASX Listing
Rules), the Company does not undertake any obligation to update or revise any forward-looking statements to reflect new information or future events.
• The material assumptions underpinning the production targets and forecast financial information in this presentation are set out in the Company’s ASX announcements dated 22 May 2023 (‘Mt Carbine BFS Update’),26 May 2025 (‘Mt
Carbine Production Targets Update’), 22 Oct 2025 (‘Barruecopardo Ore Reserve and Production Update’) and in the EQ Resources Ltd Annual Report 2025 lodged with ASX on 30 September. The Company confirms that all material
assumptions underpinning those targets and forecast financial information continue to apply and have not materially changed.
2
EQ Resources is delivering tungsten into global supply chains from Australia & Europe’s
largest tungsten mines
Corporate Overview
3
Capital Structure Shareholders Production WO3 Investment Case
✓ Strong Market Fundamentals
✓ Scalable, Producing Operations
✓ Long-Term Spot Priced Offtakes
✓ Experienced Team
1 As at market close 16 March 2026, EQ Resources closing share price of $0.36 per share.
2 Cash as at 16 March 2026
3 These figures are aspirational operational objectives only. They are not formal production targets for the purposes of the ASX Listing Rules, are not production guidance or a forecast of actual annual production, and are
not underpinned by a published life-of-mine production schedule and disclosed modifying-factor assumptions. Refer ASX announcement dated 12 December 2025 and slide 6 of this presentation for the mine-by-mine
breakdown
Market Cap1 $1.75Bn
Shares on Issue1 4.88Bn
Options on issue1 270M
Cash on hand2 $18M
Oaktree1 15.1%
Board & Management1 4%
Other1 80.9%
FY25 Production: 1,678 t
Targeted Production3 >3,350tpa
1750tpa Mt
Carbine
+
>1600tpa
Barruecopardo
Analyst Coverage
3
Critical & Strategic by Design Allied Policy Tailwinds Exceptional Tungsten Expertise
Tungsten listed as critical and strategic by the
EU, U.S, Japan, Korea and Australia.
With global geo-political tensions, producers like
EQR with assets in stable jurisdictions, are key to
rebuilding resilient, ethical tungsten supply
chains.
US$8.5 bn US – Australia Critical Minerals
Framework announced October 2025
U.S. EXIM Bank Letter of Interest (US$34m).
EQR has extensive experience in developing,
operating and marketing tungsten within the
Board and Management.
Why Tungsten, Why Now
Right Metal, Right Timing, Right Team
Unrestricted countries contribute only 13% of global supply1
26%
11%
14%
25%
9%
8%
7%
Mining &
Construction
Transport
Chemical/
Petrochemical
Consumer
Durables
Energy
2024
Defence
Industrial &
Medical
End-Use Sectors Driving Tungsten Demand
Source: ITIA – Tungsten End-Use Analysis (2024), Demand distribution and Growth Contributors
Bolivia
1,600t (2.0%)
Spain
700t (0.9%)
Portugal
500t (0.6%)
Austria
800t (1.0%)
Rwanda
1,200t (1.5%)
Russia
2,000t (2.5%)
North Korea
1,700t (2.1%)
China
67,000t (82.7%)
Vietnam
3,400t (4.2%)
Australia
1,000t (1.2%)
Non-restricted country Restricted country
1 US Geological Survey, Mineral Commodity Summaries, January 2025
4
Market Dynamics Driving Higher Prices
Ethical, sustainable supply chain positioned to capitalise on tightening markets and policy tailwinds.
Structural Supply Deficit Driving Higher Prices
-30,000
-25,000
-20,000
-15,000
-10,000
-5,000
0
5,000
10,000
15,000
2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
Tonnes
W
Surplus Forecast 1(a) Surplus Forecast 2(b) Surplus Forecast 3(c)
Global Tungsten Market Moves into Supply Deficit
Source: (a) Argus Tungsten Analytics (2021), (b) Roskill Tungsten Outlook to 2030 (2021), (c) ITIA Tungsten End Use Analysis (2021)
China imposed tungsten
export restrictions (Feb'25)
Source: Fastmarkets. Tungsten APT 88.5% WO3 (High) min cif Rotterdam and Baltimore duty-free, $/mtu WO3
Deepening Structural Deficit Tight Market, Strengthening Prices Increased Production in Near Term
China controls 85%+ of global tungsten supply. APT pricing continues to strengthen as supply
deficit and lack of inventories bites.
EQR produced 1,678 tonnes of WO3 in FY2025.
Limited near-term Western projects are coming
online despite rising demand from defence,
aerospace, and clean-energy sectors
APT pricing is largely driven by the shortage of
supply in the western supply chain.
Record production Oct 2025 – Barruecopardo
Record Drilling, Blasting. Material Mined Oct to
Dec 2025 – Mt Carbine
Intended to support higher production in the June
2026 quarter, subject to operating conditions
5
0
500
1,000
1,500
2,000
2,500
3,000
0.025
0.075
0.125
0.175
0.225
0.275
0.325
0.375
0.425
APT
Price
2
(US$
/
mtu)
EQR
Share
Price
1
(AU$)
EQR Share price Apt Price (High)
Two Producing Mines in Tungsten Rich Regions
Both operations are 100% owned with scalable opportunities
6
Mt Carbine | Australia1 Australia’s Tungsten Cluster
Tungsten Production
(FY25)
48,782 mtu
Targeted Production3 175,000 mtu per annum
Mineral Resource2 41.4Mt @ 0.23% WO3
Reserve Mine life4 8 years
Reserve to Resource 23%
Exploration opportunity Wolfram Camp
Key Facts
Spain’s Tungsten Cluster
Barruecopardo | Spain1
Tungsten Production
(FY25)
119,410 mtu
Targeted Production3 >160,000 mtu per annum
Mineral Resource2 22.9Mt @ 0.20% WO3
Reserve Mine life4 9 years
Reserve to Resource 45%
Exploration opportunity 8 adjacent exploration licences
Key Facts
1 Based on Measured and Indicated Mineral Resources disclosed in EQ Resources Limited Annual Report 2025, Mt Carbine and Barruecopardo are presented as Australia’s and Europe’s largest operating tungsten mines, respectively, by M&I Resource tonnage.
2 Refer EQ Resources Limited Annual Report 2025.
3 These figures are aspirational operational objectives only. They are not formal production targets for the purposes of the ASX Listing Rules, are not production guidance or a forecast of actual annual production, and are not underpinned by a published life-of-mine production schedule
and disclosed modifying-factor assumptions. Refer ASX announcement dated 12 December 2025 and slide 3 of this presentation for the group production summary..
4 Refer to ASX Announcement dated 12 December 2025 for further detail.
*1 MTU = 10kg WO3
#1
#1
Reserves make up only 23% of the Resource
Priority focus
• Processing the high-grade Iolanthe Vein of 1.6mt @ 0.262% WO3
• Installing and commissioning purchased equipment to double
crushing circuit .
• Commence 27 hole 7,830m on mining lease resource in-fill and
expansion drilling program.
• Commence drill program at Wolfram Camp.
• Progress the underground feasibility study.
• Progress hub and spoke concept modelling.
Expanding Mt Carbine Operations
7
Resources and Reserves
1 Refer EQ Resources Limited Annual Report 2025.
2 Refer EQ Resources Limited Annual Report 2025..
*1 MTU = 10kg WO3
Wolfram Camp
Opportunity to develop hub and spoke with Mt Carbine
Overview
• Located ~60kms south of Mt Carbine Operations
• Historical mining operation awarded to EQ Resources in 2024 as
part of the Queensland Abandoned Mine Lands Program
• Has potential to provide high grade ore to Mt Carbine for
processing
• Five prospective exploration targets have been identified:
• Wolfram Camp and surrounds (historic mine)
• Bamford Hill and Sunny Corner
• Three Mile and Four Mile
• Eight Mile and Captain Morgan
• Lucky Hit
8
Orebody1 Estimate
Category
Tonnes
(kt)
Grade
(%WO3)
WO3
(mtu)
Greisen
Indicated 442 0.15% 66,300
Indicated 1,829 0.15% 274,350
Pipe Material
Indicated 77 0.69% 53,130
Inferred 602 0.69% 415,380
All Total 2,950 0.279% 823,150
Historic Foreign Estimate
1 Historic foreign estimate sourced from the 2017 Technical Report, Almonty Industries (NI 43-101). This estimate is not reported in accordance with the JORC Code and has not been verified by EQ Resources in accordance with the JORC Code. It is provided for
background information only and should not be treated as a current EQ Resources Mineral Resource or Ore Reserve
Wolfram Camp Low Grade Stockpile
*1 MTU = 10kg WO3
Reserves make up only 45% of the Resource
Expanding Barruecopardo Operations
Priority focus
• Optimising newly installed processing and sorting capacity
• Improving the consistency of feed grade and operational
improvement in the pit.
• Commencing and complete the 37 hole 12,200m resource infill
and expansion drill program.
• Developing exploration program for the eight exploration permits
adjacent to the operations.
9
Resources and Reserves
Orebody1 Resource
Classification
Tonnes
(Mt)
Grade
(%WO3)
WO3
(mtu)
In-Situ
Measured 7.68 0.18% 1,380,549
Indicated 10.00 0.18% 1,768,030
Inferred 3.82 0.26% 995,559
Subtotal 21.49 0.19% 4,144,139
All Total 21.49 0.19% 4,144,139
Reserve Category2 Tonnes
(Mt)
WO3
(%)
Contained WO3
(mtu)
Open Cut - Proven 3.65 0.14% 510,270
Open Cut - Probable 9.98 0.13% 1,339,029
Open Cut - Total 13.63 0.14% 1,849,299
Stockpile - Proven 0.24 0.17% 41,589
Stockpile - Probable
Stockpile - Total 0.24 0.17% 41,589
All - Total 13.87 0.14% 1,890,888
1 Refer EQ Resources Limited Annual Report 2025
2 Refer ASX announcement dated 22 October 2025, “EQ Resources Barruecopardo Mine Increases Ore Reserves by 39%".
*1 MTU = 10kg WO3
Strategically Positioned
EQR is one of the largest producers of tungsten outside of restricted countries, with spot-priced offtake
agreements in place, supplying Europe, North America and Asian markets.
10
EQR Production underpinned by long term spot offtake agreements
China, Russia and
North Korea
Rest of
World
North
America
25%
Asia
50%
Europe
25%
EQR is a significant producer in non-restricted countries1
SPOT
Geographic split
Pricing based on
average of month of
shipment or month prior
to month of shipment
c.50% of
demand
despite only
producing
c.13% of total
supply
c.50% of global
demand
70,700 W
(MTU)
10,300 W (MTU)
1 US Geological Survey, Mineral Commodity Summaries, January 2025. Production references CY24 production. Based on CY24 mine production of tungsten, sourced from US Geological Survey, Mineral Commodity Summaries, January 2025. For the
purposes of this presentation, “restricted countries” means China, Russia and North Korea. EQR production comprises CY24] production from Mt Carbine and Barruecopardo. Comparison is based on mine production only and excludes downstream
processing, recycling and non-operating projects.
2 EQ Resources entered a 5 year sales and distribution agreement in February 2026. Refer ASX Announvement dated 24 February 2026, “EQR reduces Spanish debt and refinances remaining Euro 15 million”.
Traxys is a strategic
partner to US $12bn
critical mineral reserve
build.
86%
14%
1
Other producers
*1 MTU = 10kg WO3
A Leading Western Tungsten Producer Positioned for Structural
Supply Tightness1
11
Diversified Scalable Producer
Producing operations in Australia and Spain with a
scalable processing platform and expansion
pathways.
Long-Term Spot-Priced Offtakes
Unhedged, long-term offtake agreements integrated
into Western supply chains across the US, Europe
and Asia.
Structural Market Tightness
Tightly held tungsten market in structural supply
deficit amid intensifying geopolitical competition
and allied supply realignment.
Strategically Positioned
A leading Western non-China supplier of tungsten
concentrate supported by government policy
alignment and strategic partners.
Expandable Resources & Reserves
Clear pathway to high-grade Iolanthe access at Mt
Carbine and disciplined growth across a long-life
asset base.
Experienced Team
Strong board and management team providing
deep industry expertise to execute on strategic
initiatives.
1 Aspirational statement and is not guidance or forecast.
Rare public-market exposure to producing Western tungsten today, with high-grade growth ahead.
Corporate Contact: Investor Relations:
Craig Bradshaw Peter Taylor
Managing Director NWR Communications
T: +61 412 036 231
E: peter@nwrcommunications.com.au
Registered Office: Mt Carbine Office:
Suite 2, Level 11, 385 Bourke Street 6888 Mulligan Highway,
Melbourne, VIC 3000 Mt Carbine Qld 4871
Australia PO Box 1496, Mareeba Qld 4880
E: info@eqresources.com.au www.eqresources.com.au
Follow us on
Share your feedback
Discover