2025 AGM Presentation
Released
Released
Announcement PDF
ASX : EQR
EQ Resources Annual General Meeting 27th November 2025
EQ RESOURCES LIMITED
A leading producer of tungsten enabling independent
global supply chain certainty
Disclaimer
2
Competent Person's Statement
• The information in this presentation relates to EQ Resources Ltd’s two principal operations — the Mt Carbine Tungsten Mine in Queensland, Australia, and the Barruecopardo Tungsten Mine in Salamanca, Spain — as well as to exploration
and Mineral Resource work undertaken across the group.
• Mt Carbine Operations (Australia)
The information relating to the Mt Carbine Mine, including exploration results, Mineral Resource and Ore Reserve estimates, and supporting technical data, is based on the outcomes of the Mt Carbine Bankable Feasibility Study Update
(May 2023), prepared by Optimal Mining Solutions Pty Ltd.
• The information was updated in EQ Resources’ Annual Report 2025 to reflect new geological, metallurgical, and operational work undertaken by Mr Tony Bainbridge. Mr Bainbridge, Member of the Australasian Institute of Mining and
Metallurgy (AusIMM No. 112770). Mr Bainbridge is engaged as a contractor to EQ Resources Ltd and is therefore not independent within the meaning of the JORC Code (2012). He has sufficient experience relevant to the style of
mineralisation, type of deposit, and activities being undertaken to qualify as a Competent Person as defined in the JORC Code (2012). Mr Bainbridge has verified and approved the data disclosed, including sampling, analytical, and test
results, and consents to the inclusion of this information in the form and context in which it appears. All material assumptions and technical parameters underpinning the updated estimates, as presented in the 2025 Annual Report and
subsequent market announcements, continue to apply and remain current.
• Barruecopardo Operations (Spain)
The information relating to the Barruecopardo Mine (Saloro S.L.U.) is based on, and fairly represents, information and supporting documentation compiled by independent consultant Mining Sense Global S.L. under the guidance of Mr
Hugh Thompson. Mr Thompson is a qualified Mining Engineer (B.Eng (Mining), Grad. Dip (Finance)) and a Fellow of the Australasian Institute of Mining and Metallurgy (FAusIMM CP Mining) with over 40 years of experience in the feasibility,
design, and operation of mining projects across Australia, Asia-Pacific, Africa, and South America. He has sufficient experience relevant to the style of mineralisation, deposit type, and activity being undertaken to qualify as a Competent
Person under the JORC Code (2012). Mr Thompson consents to the inclusion in this document of the matters based on his information in the form and context in which it appears. Neither Mr Thompson nor Mining Sense Global S.L. has any
material interest, direct or indirect, in the securities of EQ Resources Ltd or its related entities. Fees for the preparation of this information were provided on a time-and-materials basis only.
• EQ Resources Ltd confirms that it is not aware of any new information or data that materially affects the information included in the relevant market announcements, and that all material assumptions and technical parameters
underpinning the updated estimates continue to apply. The Company further confirms that the form and context in which each Competent Person’s findings are presented have not been materially modified from the information in which
they were originally reported.
General Disclaimer
• The material contained in this document is a presentation of general information about the Company’s activities current as at the date of this presentation. It is provided in summary and does not purport to be complete. You should not
rely upon it as advice for investment purposes, as it does not take into account your investment objectives, financial position or needs. These factors should be considered, with or without professional advice, when deciding if an investment
is appropriate.
• This document may contain forward-looking statements with respect to the financial condition, results of operations, and business strategy of the Company. These forward-looking statements are based on estimates, projections and
assumptions made by the Company about circumstances and events that have not yet taken place. Although the Company believes the forward-looking statements to be reasonable, they are not certain. Forward-looking statements
involve known and unknown risks, uncertainties and other factors that are in some cases beyond the Company’s control, and which may cause actual results, performance or achievements to differ materially from those expressed or
implied by the forward-looking statements (and from past results).
• The Company makes no representation or warranty as to the accuracy of any forward-looking statements in this document and undue reliance should not be placed upon such statements.
• The Company confirms all material assumptions underpinning the production targets and forecast financial information remain applicable and have not materially changed.
• Forward-looking statements may be identified by words such as “aim”, “anticipate”, “assume”, “continue”, “could”, “estimate”, “expect”, “intend”, “may”, “plan”, “predict”, “should”, “will”, or “would” or the negative of such terms or other similar
expressions that are predictions of or otherwise indicate future events or trends. The forward-looking statements included in this document speak only as of the date of this document. Except as required by law (including the ASX Listing
Rules), the Company does not undertake any obligation to update or revise any forward-looking statements to reflect new information or future events.
• The material assumptions underpinning the production targets and forecast financial information in this presentation are set out in the Company’s ASX announcements dated 22 May 2023 (‘Mt Carbine BFS Update’),26 May 2025 (‘Mt
Carbine Production Targets Update’), 22 Oct 2025 (‘Barruecopardo Ore Reserve and Production Update’) and in the EQ Resources Ltd Annual Report 2025 lodged with ASX on 30 September. The Company confirms that all material
assumptions underpinning those targets and forecast financial information continue to apply and have not materially changed.
Evren Oeren- Saloro Chief Operating Officer
• Mining engineer with global experience in processing and EPC
management.
• Oversees day-to-day operations at Barruecopardo mine.
• Strong technical and cross-cultural leadership background.
Board and Management
Establishing the right team for success
Board of Directors Management Team
Oliver Kleinhempel – Non-Executive Chairman
• Non-executive Director - August 2019, Chair - April 2020.
• Executive career in global resource industry, across project
development, finance and commodity trading.
• Executive Director at Cronimet Group.
Stephen Layton – Non-Executive Director
• 35+ years in equity capital markets in the UK and Australia.
• Experience in ASX listings and corporate advisory.
• Directorship Pursuit Minerals.
Stephen Weir – Non-Executive Director
• Appointed January 2024, representing Oaktree Capital
Management.
• Experience in corporate advisory, project finance, construction
management.
• Former CEO of Magnetite Mines Ltd, Member of the Australian
Institute of Company Directors, GBA Capital Advisory Board.
Zhui Pei Yeo – Non-Executive Director
• Background in executive management, project planning,
resource management.
• Works in system integration in telecoms in South-East Asia.
• Executive director at a steel-product manufacturer.
Jono Kort - Group Chief Financial Officer
• 20+ years in resources finance, including PanAust, BHP and Coronado
Global Resources.
• Oversees finance, treasury, investor relations and governance.
• Chartered Accountant with MSc in Mineral Economics.
Kevin MacNeill - Group Chief Technical Officer
• 35+ years in global mine development, project execution and operations.
• Former CEO EQR; ex-President Etruscan Diamonds. Founder SMP Pty
Ltd.
• Leads technical strategy for Mt Carbine (AU) and Saloro (ES).
Alvaro Serrano - Saloro Chief Executive Officer
• CEO of Saloro S.L.U., operator of Barruecopardo mine (Spain).
• 20+ years in finance and executive leadership roles.
• Holds a Degree in Economics and Executive MBA (IE Business School)
Craig Bradshaw - Managing Director
• Global tungsten industry leader; former CEO Masan High-Tech
Materials and MD H.C. Starck.
• 25+ years in mining, including senior roles with MMG and Toll
Holdings.
• Qualified CPA and member of FINSIA and AusIMM
3
Corporate Snapshot
Share Price
$0.052
as at
26 November 2025
Options on
Issue
~572 Million
Options on Issue
Market Cap
$197 Million
as at
26 November 2025
Recent Funding
+$35 Million in
Equity/Debt Funding
in Q1FY2026
Top 20
Shareholders
~71%
(~6% Board
Management)
2 Producing
Operations
Mt Carbine
(Qld, Australia)
Barruecopardo
(Salamanca, Spain)
Exploration
Permit
EPM 14872
Wolfram Camp
(Australia)
FY 2025 Annual
Production
167,805 mtu
(mtu = 10kg WO3)
EQR is advancing a sustainable tungsten platform
delivering reliable, scalable supply for the world’s
industrial applications.
With one of the largest tungsten resource bases
outside China, EQR operates the Mt Carbine
(Australia) and Barruecopardo (Spain) mines —
and has a production target of achieving a
material increase in group production
during CY20261 as Barruecopardo performance
strengthens and Mt Carbine accesses the high-
grade Iolanthe vein.
1. This is a production target and not a guarantee of future performance.. It is subject
to successful commissioning, mine scheduling, ore availability and funding. See
assumptions in the 2025 Annual Report and relevant ASX announcements
4
5
EU: The Most Critically Important Raw Material
Exceptional Tungsten Expertise
Allied Policy Tailwinds
Critical & Strategic by Design
EQR has extensive experience in developing,
operating and marketing tungsten within the Board
and Management.
US$8.5 bn US – Australia Critical Minerals Framework
announced October 2025
U.S. EXIM Bank Letter of Interest (US$34m).
Tungsten listed as critical and strategic by the EU,
U.S, Japan, Korea and Australia.
With global geo-political tensions producers like EQR
with assets in stable jurisdictions are key to rebuilding
resilient, ethical tungsten supply chains.
26%
11%
14%
25%
9%
8%
7%
Mining &
Construction
Transport
Chemical/
Petrochemical
Consumer
Durables
Energy
2024
Defence
Industrial &
Medical
End-Use Sectors Driving Tungsten Demand
Why Tungsten, Why Now
Right Metal, Right Timing, Right Team
Source: ITIA – Tungsten End-Use Analysis (2024), Demand distribution and Growth Contributors
Source: European Commission Raw Materials information Systems 2023 5
Structural Supply Deficit Driving Higher Prices
Market Dynamics Driving Higher Prices
Ethical, sustainable supply chain positioned to capitalise on tightening markets and policy tailwinds.
-30,000
-25,000
-20,000
-15,000
-10,000
-5,000
0
5,000
10,000
15,000
2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
Tonnes
W
Surplus Forecast 1(a) Surplus Forecast 2(b) Surplus Forecast 3(c)
6
Global Tungsten Market Moves into Supply Deficit
Source: (a) Argus Tungsten Analytics (2021), (b) Roskill Tungsten Outlook to 2030 (2021), (c) ITIA Tungsten End Use Analysis (2021)
300
350
400
450
500
550
600
650
700
750
0.025
0.035
0.045
0.055
0.065
0.075
0.085
0.095
Jan-23
Feb-23
Mar-23
Apr-23
May-23
Jun-23
Jul-23
Aug-23
Sep-23
Oct-23
Nov-23
Dec-23
Jan-24
Feb-24
Mar-24
Apr-24
May-24
Jun-24
Jul-24
Aug-24
Sep-24
Oct-24
Nov-24
Dec-24
Jan-25
Feb-25
Mar-25
Apr-25
May-25
Jun-25
Jul-25
Aug-25
Sep-25
Oct-25
APT
Price
(US$
/
mtu)
EQR
Share
price
(AU$)
China imposed tungsten
export restrictions (Feb'25)
Source: Fastmarkets. Tungsten APT 88.5% WO3 min cif Rotterdam and Baltimore duty-free, $/mtu WO3
Increased Production in Near Term
Tight Market, Strengthening Prices
Deepening Structural Deficit
EQR produced 1,678 tonnes of WO3 in FY2025.
APT pricing remains elevated as Chinese export
controls and limited Western output tighten supply.
China controls 85%+ of global tungsten supply.
With recovery improvements at Barruecopardo and a
waste cut back underway at Mt Carbine, EQR is well
placed to significantly increase production subject to
execution of planned activities.
APT pricing is largely driven by the shortage of supply
in the western supply chain.
Few new near-term Western projects are coming
online despite rising demand from defence,
aerospace, and clean-energy sectors
6
Flagship Operations / 'Hub & Spoke' Opportunities
EQR’s dual tungsten hubs in Australia and Spain form the backbone of a scalable Western supply platform
Mt
Carbine
Open
Pit
&
Processing
Plants
Mt
Carbine
Open
Pit
&
Processing
Plants
#1
#1
Tier 1 Jurisdiction Producing Tungsten
Assets, with Similar Characteristics:
Similar mineralogy:Both are hostedin
sheeted quartz
Complementarygeology:Granite
(Barruecopardo) and Metasediments(Mt Carbine)
Identicalmining method: Openpit blast plus
truck and excavator - similar fleet.
Similar processing:Crushing, screening, XRT
sorting, jigs and tables; Barruecopardo incorporates
flotation and mag sep cleanup, due to mineral
composition.
Ore-sorting & by-product credits support low unit
costs.
Synergy in marketing: Both supplying the same
end customers
Both operating adjacent to world renowned
National Parks (strong ESG credential)
Organisational and significanttechnical synergies
(comparable operational output)
7
8
45
training courses
undertaken
~20,000
fit to work test conducted
(Drug & Alcohol)
17,115
Job Safety
Analysis
88
Verification of
Competencies
+8.95%
Hours Worked
on Site YoY
Mt Carbine
14
training courses
undertaken
16,249
fit to work test conducted
(Drug & Alcohol)
1,348
Job Safety analysis
(Take 5)
Saloro
Barruecopardo
48 47
50 51
46
49 49
54 54
49
40
37
28 26
23
13
11 11
13
19
16
19
22 22
0
10
20
30
40
50
60
Lost Time Injury Frequency Rate *
LTIFR Mining Mt Carbine Barruecopardo
*Frequency Rate per Million hours worked on site
Health & Safety
8
4th November 2025
Mining
~7.0 Mt
Material moved
~1.3 Mt
Ore mined
~5.7 Mt
Waste mined
4.4:1
Strip ratio
209,000 t
Closing stockpile
0.19% WO₃
Average ore grade mined
Processing
63.3%
Highest monthly
recovery achieved
1.45
million tonnes
of ore crushed
0.9
million tonnes processed
through the Gravity
+52%
increase Ore Sorter
throughput YoY
119,000+
mtu produced
FY2025 + 28% YoY
Saloro
Barruecopardo
Saloro (Spain)
Europe’s largest tungsten mine, with outstanding ESG credentials, additional ramp-potential and regional exploration upside.
See ASX Announcement: ‘EQR Releases Barruecopardo Ore Reserves, With Next Phase Drilling
Program Scheduled for 2025’, dated 29th October 2024.
Tungsten Cluster - Spain
Ref: ASX Announcement 22 Oct 2025 (Link)
WO3
(mtu)
Grade
(% WO3)
Tonnes
(Mt)
Resource
Classification
Orebody
1,380,549
0.18
7.68
Measured
In-Situ
1,768,030
0.18
10.00
Indicated
995,559
0.26
3.82
Inferred
4,144,139
0.19
21.49
Subtotal
4,144,139
0.19
21.49
Total
All
Contained
WO3
(mtu)
WO3
(%)
Tonnes
(Mt)
Reserve Category
510,270
0.140
3.65
Open Cut - Proven
1,339,029
0.134
9.98
Open Cut - Probable
1,849,299
0.136%
13.63
Open Cut - Total
41,589
0.173%
0.24
Stockpile - Proven
Stockpile - Probable
41,589
0.173%
0.24
Stockpile - Total
1,890,888
0.136%
13.87
All - Total
• Tier-1 European asset with mining lease to 2044.
• A$200 m invested pre-EQR acquisition in plant, infrastructure, and
permitting.
• Minimum 9-year reserve mine plan with expansion potential.
• 3rd XRT ore sorter installed and commissioned in Q1 FY2026.
• Reserve increased by 39% as at 30 June 2025 (Oct 2025)
• Production target of > 1,600 t WO₃/yr1, driven by operational
improvements and subject to performance and optimization outcomes
• Strong ESG performance: adjacent to Natura 2000 reserve, operating
under EU sustainability standards.
• 130-person team delivering concentrate to US and European industrial
consumers.
Ref: EQR Annual Report 2025 (Link)
1. This is a production target and not a guarantee of future performance. It is based on the material assumptions and modifying
factors set out in the 2025 Annual Report and ASX announcements dated 29 Oct 2024 reserve update. 10
11
Current Ore Reserves covers only ~45% of the known Mineral Resource (JORC),
planning 37 holes for 12,220m for CY 2026.
Barruecopardo Project - Significant Resource Upside1
Current Ore Reserves and mine plans cover only part of the JORC Mineral Resource, with additional Mineral Resources outside the
current mine plans that may be evaluated through future drilling and studies
11
1. Mineral Resources that are not Ore Reserves do not have demonstrated economic viability. There is no certainty that any part of the Mineral Resources not currently included in Ore Reserves
or mine plans will be converted to Ore Reserves or that any related production targets will be realized.
4th November 2025
Mining
2.24
millions tonnes
material extracted
0.57
million tonnes
of ore
1.67
million tonnes
of waste
Transition
to Owner
Operator
~55
staff in mining
operations
Mt Carbine Mine
Processing
756k
tonnes of
ore crushed
48,771
mtu produced
462k
tonnes of
ore sorted
~79%
final recovery
Minimum 8-year mine life utilises just 23 % of known resource
— strong growth and underground upside.
• Tier-1 jurisdiction with 19-year permit and 8-year LOM on current reserves.
Reserves represent only 23% of the JORC Resource.
• $50m invested in development and processing upgrades.
• 2023 BFS underpins open pit; UG study advancing Iolanthe vein.
• Southern Wall pushback underway and expected to provide access to
higher-grade ore from 2026, subject to mining schedule.
• Wolfram Camp (EPM RA442) extends regional tungsten cluster.
• Production target of ~1,750 t WO₃/yr1, contingent on completion of plant
upgrades and efficiency gains. See assumptions in the 2025 Annual Report.
• 150-person team exporting concentrate to global consumers.
Mt Carbine (Aus): In Production, Expanding For Growth
Australia’s flagship tungsten mine — long-life asset advancing toward higher-grade production and underground expansion.
Ref: EQR Annual Report 2025 (Link)
Tungsten Cluster - Australia
Orebody Table: Resources exclude the historical Wolfram camp resource of 2.39mt @
0.29% WO3. (Wheeler,2015). NEQ Deposit Atlas - Wolfram Camp Tungsten Deposit or
Wolfram Camp- Technical Report; Reserve Category Table: The Mineral Resource is
inclusive of the Reserve.
WO3
(mtu)
Grade
(% WO3)
Tonnes
(Mt)
Resource
Classification
Orebody
759,450
0.08%
10.13
Indicated
Low-Grade Stockpile
153,112
0.07%
2.37
Indicated
53,789
0.06%
0.83
Inferred
966,351
0.07%
13.33
Subtotal
5,194,221
0.30%
17.35
Indicated
In-Situ 3,217,311
0.30%
10.68
Inferred
8,411,532
0.30%
28.03
Subtotal
9,377,883
0.23%
41.36
Total
All
Contained WO3
(mtu)
WO3
(%)
ROM Tonnes
(Mt)
Reserve Category
-
-
-
Open Cut - Proven
1,459,735
0.28%
5.21
Open Cut - Probable
1,459,735
0.28%
5.21
Open Cut - Total
-
-
-
LGSP - Proven
719,030
0.075%
9.59
LGSP - Probable
719,030
0.075%
9.59
LGSP - Total
2,178,765
0.147%
14.80
All - Total
13
1. This is a production target and not a guarantee of future performance. It is based on the material
assumptions and modifying factors set out in the 2025 Annual Report and the Company’s Mt Carbine BFS and
production target update announcements.
14
Current Ore Reserves / Mine Planning covers only ~23% of the known Mineral Resource (JORC).
Mt Carbine Project Profile - Significant Resource Upside1
Current Ore Reserves and mine plans cover only part of the JORC Mineral Resource, with additional Mineral Resources outside the current mine
plans that may be evaluated through future drilling and studies
1. Mineral Resources that are not Ore Reserves do not have demonstrated economic viability. There is no certainty that any part of the Mineral Resources not currently included in Ore Reserves
or mine plans will be converted to Ore Reserves or that any related production targets will be realized.
- Southern Wall stripping
momentum continues to
build with night shift
commencing from 14
November 2025
- Daily movement rates
now consistently meeting
target of 400,000 tonnes
per month.
- Mining continues
through the 365 RL in
November 2025.
- Iolanthe vein commences
between the 325 and 335
RLs with some ore
expected between the
335 and 345 RLs based on
GC drilling.
South Wall Stripping Underway to Unlock Higher-Grade In-situ Ore
15
Balance Sheet – Repair & Simplification Underway
The Board has been focused on simplifying and strengthening the Balance Sheet to ride out unforeseen events
which have previously had significant impact to The Company’s development.
1 This is an aspirational statement only and does not constitute financial guidance or a forecast. Actual outcomes may differ, particularly if commodity prices, operating performance or funding conditions vary from assumptions.
16
Overdue Payables Reduction
Overdue payables reduced by AU$15.6m at the end of
October 2025, with negotiations of the remaining
AU$12.6m being finalised.
Cash Position
Available Cash at the end of October 2025 of ~AU$12m.
Asset-Level Cash Generation
Spanish operations have been cash generating since
August 2025, with Australian assets expected to begin cash
generation from February 2026, based on current pricing¹.
Spanish Debt Refinance Progress
Term Sheets received for the refinancing of the EUR 20m
Spanish Debt, including repayment of EUR 3.5m with the
balance proposed under new term facilities. Due diligence
is underway to progress to binding outcomes.
Guarantee Extensions for Continuity
OCM Letters of Guarantee for the Spanish Debt are
expected to be extended to cover the period required to
finalise new financing facilities.
Engagement with Spanish Lenders
Discussions are well advanced with Spanish lenders
regarding extensions aligned with OCM Guarantees,
ensuring continuity while new facilities are completed.
Investment Case
EQ Resources is a global tungsten producer with mining activities in Australia and Spain and is aiming to be the
leading western integrated platform for tungsten materials1.
Diversified Scalable Producer
Global producer with producing operations in Spain and
Australia.
Long term offtake agreements at Spot
Long term unhedged offtake agreements integrated into the
supply chain with customers in US, Europe and Asia.
Supportive Market Fundamentals
Tightly held tungsten market with ongoing supply chain
constraints amidst intensifying geopolitical competition.
Strategically Positioned
Significant producer of Western tungsten supported by
government and corporate partners.
Supply Chain Integration Initiatives
Developed strategic partnerships to create a network
within the global tungsten ecosystem.
Experienced Team
Strong board and management team providing deep
industry expertise to execute on strategic initiatives.
1 Aspirational statement and is not guidance or forecast.
17
Corporate Contact: Investor Relations:
Craig Bradshaw Peter Taylor
Managing Director NWR Communications
T: +61 437 027 223 T: +61 412 036 231
E: cbradshaw@eqresources.com.au E: peter@nwrcommunications.com.au
Registered Office: Mt Carbine Office:
Suite 2, Level 11, 385 Bourke Street 6888 Mulligan Highway,
Melbourne, VIC 3000 Mt Carbine Qld 4871
Australia PO Box 1496, Mareeba Qld 4880
E: info@eqresources.com.au www.eqresources.com.au
Follow us on
Share your feedback