Confirmation of Initial Ore Reserve Section at Mt. Carbine
Released
Released
Announcement PDF
resourcing the new economy for a better tomorrow
19th July 2023
INFILL GRADE CONTROL DRILLING CONFIRMS INITIAL
ORE RESERVE SECTION AT MT. CARBINE
EQ Resources Limited is the 100% owner of the Mt Carbine Tungsten Mine near Cairns.
EQ Resources Limited (“EQR” or “the Company”) is pleased to announce that it has completed 115 Grade
Control drill holes from a total of 155 planned holes that will provide the basis of a detailed ‘Dig Model’ for the
Ore Reserves over the next 12 months. The program provides an infill to the 30m spaced Ore Reserve drilling
(see ASX announcement ‘43% Increase in Mt Carbine Ore Reserves from Western Pit Extension’ dated 18th
May 2023). This Grade Control drilling is expected to be completed by Mid-August and all assays available by
end of August.
Assays* have been received for 16 of the 115 holes completed and are shown in Table 1. The first 5 RC holes
formed a section through the Johnson Ore Zone and are considered for comparison against the Ore Reserve
Model. The infill holes reflect close spaced detail of mineralisation and are compared against the Company’s
Ore Reserve Model in the diagrams below. The shape and grades reflect well, with the detailed Grade Control
drilling showing a 0.65% WO3 weighted average against a 0.48% WO3 average in the Ore Reserve Model. It
should be borne in mind this is a single section and is not a correlation of an entire 3D block model.
Mineralisation has also been visually intersected in two lodes (Bluff and Johnson) on the 315m RL Pit floor as
shown in the Ore Reserve model as well.
Figure 1 - Grade Control Drilling and Resource Model Comparison
REGISTERED OFFICE: Level 4, 100 Albert Road, South Melbourne, VIC 3205
PRINCIPAL PLACE OF BUSINESS: 6888 Mulligan Highway, Mt Carbine Qld 4871
POSTAL ADDRESS: PO Box 1496, Mareeba Qld 4880
ABN: 77 115 009 106 (ASX: EQR)
T: (07) 4094 3072 | F: (07) 4094 3036 | W: eqresources.com.au
resourcing the new economy for a better tomorrow
Figure 2 - Cross Section of the Johnson Zone
EQR CEO, Kevin MacNeill, commented: ‘‘I am pleased with the initial trial works for mining at Mt Carbine with
three blasts on 25th June, 1st and 16th July completed and the early results from infill grade control drilling
supporting our reserve model work. Material ore haulage during July is expected to be +40,000t of ore as we
ramp up toward monthly plant production capacities over the coming months. As we ramp up ore deliveries, I
look forward to showing our increase in tungsten production.”
Hole #
East
North
Rl
EOH
Dip
Azm (TN) From
180
3
180
7
To
Interval
WO3 %
RC1
22903
26367
325
50.0
60
10
7
25
18
25
6
24
41
17
180
10
11
1
0.91%
0.59%
0.79%
0.51%
0.82%
1.14%
0.63%
1.14%
1.37%
0.97%
1.16%
0.49%
0.30%
0.78%
0.49%
RC2
22903
26377
325
50.0
60
RC3
22903
26387
325
50.0
60
180
19
RC4
22903
26397
325
50.0
60
180
RC5
22903
26407
325
50.0
60
RC5
22903
26360
325
50.0
60
180
25
26
1
RC5
22903
26370
325
50.0
60
180
36
47
11
RC6
22913
26360
325
50.0
60
180
9
10
1
RC7
22913
26370
325
50.0
60
180
10
13
3
RC8
22913
26380
325
50.0
60
180
15
24
9
RC9
22900
26225
325
50.0
60
180
15
32
17
RC10
22890
26315
325
50.0
60
180
11
13
2
RC11
22890
26335
325
50.0
60
180
0
2
2
RC12
22880
26335
325
50.0
60
180
2
4
2
RC13
RC14
RC15
22885
22900
22900
26345
26345
26315
325
325
325
50.0
50.0
50.0
60
60
60
180
10
180
180
0
12
2
No sign results
2
2
RC15
22900
26315
325
50.0
60
180
10
14
4
RC16
22900
26335
325
50.0
60
180
21
23
2
0.70%
1.17%
1.06%
Table 1 - Grade Control Results from RC Drilling**
* Note for grade control RC sampling the Company is using its own calibrated internal laboratory set up with a Thermo Scientific ARL
Quant'X X-Ray Fluorescence Spectrometer that has been calibrated with official standards and has a 10% external QAQC program being
applied to all assays. This machine however is not from a NATA accredited lab. See attached Table 1 from the JORC Code for full
information on processing and QAQC details.
** Intervals in Table 1 are downhole intervals on 60-degree holes. True widths are yet to be calculated but are approximately 50-60% of
the downhole interval depending on vein dip at intersection.
Page 2
resourcing the new economy for a better tomorrow
Released on authority of the Board by:
Further Enquiries:
Kevin MacNeill
Chief Executive Officer
Peter Taylor
Investor Relations
0412 036 231
peter@nwrcommunications.com.au
About the Company
EQ Resources Limited is an ASX-listed company transforming its world-class tungsten assets at Mt Carbine in North
Queensland; leveraging advanced technology, historical stockpiles and unexploited resource with the aim of being the preeminent tungsten producer in Australia. The Company also holds gold exploration licences in New South Wales. The
Company aims to create shareholder value through the exploration and development of its current portfolio whilst
continuing to evaluate corporate and exploration opportunities within the new economy and critical minerals sector.
Competent Person’s Statements
EQ Resources’ exploration and resource work is being managed by Mr. Tony Bainbridge, AusIMM. Mr. Bainbridge is
engaged as a contractor by the Company and is not "independent" within the meaning of the Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code). Mr. Bainbridge has sufficient
experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which
he is undertaking to qualify as a Competent Person as defined in JORC Code 2012.
The technical information contained in this announcement relating exploration results are based on, and fairly represents,
information compiled by Mr. Bainbridge. Mr. Bainbridge has verified and approved the data disclosed in this release,
including the sampling, analytical and test data underlying the information. The Grade Control drilling samples are assayed
internally using the Company’s XRF machine which has gone thru a rigorous calibration against the ALS (Brisbane) XRF
machine and has excellent ongoing QAQC data correlation. This internal lab is not NATA accredited. Mr. Bainbridge has
consented to the inclusion in this release of the matters based on his compiled information in the form and context in which
it appears in this release. This information is considered by the Competent Person to be important for shareholders to
understand the results of this Grade Control drilling.
Forward-looking Statements
This announcement may contain forward-looking statements. Forward-looking statements address future events and
conditions and therefore involve inherent risks and uncertainties. Actual results may differ materially from those currently
anticipated in such statements. Particular risks applicable to this announcement include risks associated with planned
production, including the ability of the Company to achieve its targeted production outline due to regulatory, technical or
economic factors. In addition, there are risks associated with estimates of resources, and there is no guarantee that a
resource will have demonstrated economic viability as necessary to be classified as a reserve. There is no guarantee that
additional exploration work will result in significant increases to resource estimates. Neither the Australian Securities
Exchange nor its Regulation Services Provider (as that term is defined in policies of the Australian Securities Exchange)
accepts responsibility for the adequacy or accuracy of this announcement.
Follow us:
Page 3
resourcing the new economy for a better tomorrow
APPENDIX A:
JORC Table 1 – Grade Control Drilling
Section 1 - Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria
Sampling
techniques
Drilling
techniques
Explanation
Commentary
Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised
industry
standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or
handheld XRF instruments, etc.).
These examples should not be taken
as limiting the broad meaning of
sampling.
Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of
mineralisation that are Material to the
Public Report. In cases where
‘industry standard’ work has been
done this would be relatively simple
(e.g. ‘reverse circulation drilling was
used to obtain 1 m samples from
which 3 kg was pulverised to produce
a 30 g charge for fire assay’). In other
cases, more explanation may be
required, such as where there is
coarse gold that has inherent
sampling
problems.
Unusual
commodities or mineralisation types
(e.g. submarine nodules) may warrant
disclosure of detailed information.
Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc.) and
details (e.g. core diameter, triple or
standard tube, depth of diamond tails,
face-sampling bit or other type,
whether core is oriented and if so, by
what method, etc.).
RC Drilling was taken at 1m intervals through the
splitter cyclone on the rig. The 1m samples were
recorded for depths, weight, sample number & hole
number.
The sample weighed approximately 4-4.5kg each
represent 1m drilled and passed a P90 of 1mm. The
samples were split thru a rotary splitter or riffle
splitter (both were used) to reduce to 500gm sample
charge with a series of A, B, C & D splits being
taken. Each of these samples were pulverized in
their entirety and returned to their sample bag. The
pulverized sample passed a P90 of -75 microns and
was considered homogeneous.
Assay was completed by taking 5gm charge of the
homogeneous sample and analysing on the
Thermo
Scientific
ARL
Quant'X
X-Ray
Fluorescence Spectrometer which had had a 200sample calibration completed. The Internal XRF
benchtop machine reported the results direct to the
LIMS software system and was analysed for both
Tungsten and Sulphur. Every 10th sample is sent to
ALS for QAQC and results recorded to see
accuracy. In addition, internally the lab is doing a
blank and registered tungsten sample analysis in
every 10-sample batch. This represents a 20%
internal QAQC protocol and a 10% external
protocol. This is deemed necessary to ensure that
our XRF does not drift and reports accurately.
The drilling for the first 8 holes was completed with a
Reverse Circulation Drill rig using 115mm diameter
drill bits with a 950 cfm compressor. For holes
EQRC009 onwards the drilling was completed by
an Epiroc D65 blast hole rig fitted with air blast
technology and a sample cyclone splitter. Both rigs
were deemed appropriate for this type of sample
collection.
Sufficient air was present to ensure all the chips were
lifted and the consistent weight to the samples
showed the chips were returning in an orderly
fashion. No lag on veins was recorded which might
have indicated contamination. The splitter on the
Hanjin Rig was a cyclone with a ¼ cone spitter
which was emptied direct to a calico sample bag.
Drill sample
recovery
Method of recording and assessing core
and chip sample recoveries and
results assessed.
Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
Calculated weights for the diameter hole were at 4.2kg
with average sample weights being 4.3kg which is
considered to be within margin for this type of
drilling. It was deemed a full recovery was achieved
Page 4
resourcing the new economy for a better tomorrow
Criteria
Logging
Explanation
Commentary
Whether a relationship exists between
sample recovery and grade and
whether sample bias may have
occurred due to preferential loss/gain
of fine/coarse material.
Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate
Mineral
Resource
estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or
quantitative in nature. Core (or
costean, channel, etc.) photography.
The total length and percentage of the
relevant intersections logged.
with no lag of sample at bottom or surging thru the
system.
The chips were sieved and a chip tray of samples
collected for each meter of RC drilling. The Chips
were logged for geology and mineralisation with the
UV used to identify the mineralisation in the hole.
Assaying of the holes show that visible UV light
logging was accurate within 20% of the predicated
grade.
The logging also indicated the presence of quartz and
since no tungsten is occurring the country rocks
outside the veins it was necessary to ensure all
quartz zones were assayed.
If core, whether cut or sawn and whether
Sub-sampling
quarter, half or all core taken.
techniques and
If non-core, whether riffled, tube
sample
sampled, rotary split, etc. and whether
preparation
sampled wet or dry.
For all sample types, the nature, quality,
and appropriateness of the sample
preparation technique.
Quality control procedures adopted for
all sub-sampling stages to maximise
representative of the samples.
Measures taken to ensure that the
sampling is representative of the in
situ material collected, including for
instance
results
for
field
duplicate/second-half sampling.
Whether sample sizes are appropriate to
the grain size of the material being
sampled.
The sample weighed approximately 4-4.5kg each
represent 1m drilled and passed a P90 of 1mm. The
samples were split thru a rotary splitter or riffle
splitter (both were used) to reduce to 500gm sample
charge with a series of A, B, C & D splits being
taken. Each of these samples were pulverized in
their entirety and returned to their sample bag. The
pulverized sample passed a P90 of -75 microns and
was considered homogeneous.
The nature, quality and appropriateness
of the assaying and laboratory
procedures used and whether the
technique is considered partial or
total.
For geophysical tools, spectrometers,
handheld XRF instruments, etc., the
parameters used in determining the
analysis including instrument make
and
model,
reading
times,
calibrations factors applied and their
derivation, etc.
Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates,
external
laboratory
checks) and whether acceptable
levels of accuracy (i.e. lack of bias)
and precision have been established.
The laboratory used for the assay of the RC Grade
Control drill holes and Blast holes is an internal
laboratory run by EQR company. It is not a Nata
accredited laboratory but is managed and run as an
independent arm of the company with all steps and
measures being undertaken to provide a full QAQC
framework for operation. The monitoring of the
benchtop XRF machine is an ongoing basis and is
being calibrated against both repeat results sent to
ALS (BNE) as well as set tungsten standards that
were purchased and fit for purpose. Blanks also
ensure no carry over is occurring.
Quality of
assay data and
laboratory tests
Assay was completed by taking 5gm charge of the
homogeneous sample and analysing on the
Thermo
Scientific
ARL
Quant'X
X-Ray
Fluorescence Spectrometer which had had a 200sample calibration completed. The Internal XRF
benchtop machine reported the results direct to the
LIMS software system and was analysed for both
Tungsten and Sulphur. Every 10th sample is sent to
ALS for QAQC and results recorded to see
accuracy. In addition, internally the lab is doing a
blank and registered tungsten sample analysis in
every 10-sample batch. This represents a 20%
internal QAQC protocol and a 10% external
protocol. This is deemed necessary to ensure that
our XRF does not drift and reports accurately.
The XRF Technique employed is the same XRF-B
technique that has been used in the ALS lab for all
the assaying at Mt Carbine. By using the same
samples to calibrate this machine it is deemed by
Page 5
resourcing the new economy for a better tomorrow
Criteria
Explanation
Commentary
the author to be representative of the definitive
value for both Tungsten and Sulphur in the sample.
Results of the calibration work with ALS ae shown here
with this comparison continually occurring.
Example of tungsten QAQC result of the Internal EQR
Laboratory against ALS (Bne) results for tungsten.
.
Example of tungsten QAQC result of the Internal EQR
Laboratory against ALS (Bne) results for Sulphur.
Verification of
sampling and
assaying
Location of
data points
The
verification
of
significant
intersections by either independent or
alternative company personnel.
The use of twinned holes.
Documentation of primary data, data
entry procedures, data verification,
data storage (physical and electronic)
protocols.
Discuss any adjustment to assay data
Accuracy and quality of surveys used to
locate drill holes (collar and downhole surveys), trenches, mine
workings and other locations used in
Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
See Above
All collars are clearly marked with a PVC collar with the
hole number recorded and surveyed by DGPS to an
accuracy of +/- 10mm.
Page 6
resourcing the new economy for a better tomorrow
Criteria
Data spacing
and distribution
Orientation of
data in relation
to geological
structure
Sample
security
Audits or
reviews
Explanation
Commentary
Data spacing for reporting of Exploration
Results.
Whether the data spacing and
distribution is sufficient to establish
the degree of geological and grade
continuity appropriate for the Mineral
Resource
and
Ore
Reserve
estimation
procedure(s)
and
classifications applied.
Whether sample compositing has been
applied.
Whether the orientation of sampling
achieves unbiased sampling of
possible structures and the extent to
which this is known, considering the
deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered
to have introduced a sampling bias,
this should be assessed and reported
if material.
The measures taken to ensure sample
security.
The RC holes are spaced at 10m intervals and are at a
consistent 50-degree dip on level 325m RL and 60
degrees on the 315m RL.
The results of any audits or reviews of
sampling techniques and data.
A continual program of QAQC is being undertaken with
a 10% lab check of our assaying as well as 10%
blank and 10% standard assay per batch of 10
samples. In all a 30% QAQC factor is being
conducted on the assaying on site.
Sample compositing was used on the RC holes on a
5m basis for Sulphur analysis with the sulphur
results being block model to determine any potential
PAF indicator present (ie Sulphur above 0.3% S)
The 50 & 60-degree holes were planned to provide a
continuous cross section of the system. The veins
are vertical (+/- 3 degrees) and as such the drilling
cuts across the mineralised veins.
All samples were daily collected and sent to the
companies new covered core shed / lab. The
samples were stored with security to ensure no
contamination etc of the sample.
Section 2 - Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
Mineral
tenement and
land tenure
status
Exploration
done by other
parties
Explanation
Commentary
Type, reference name/number, location
and ownership including agreements
or material issues with third parties
such as joint ventures, partnerships,
overriding royalties, native title
interests, historical sites, wilderness
or national park and environmental
settings.
The security of the tenure held at the
time of reporting along with any
known impediments to obtaining a
licence to operate in the area.
Acknowledgment and appraisal of
exploration by other parties.
The grade control results here reported herein are all
within Mining Leases 4867 (358.5ha, expiry 31-0722) and 4919 (7.891ha, expiry 31-08-2049), held by
Mt Carbine Quarries Pty Ltd. The Mining Leases lie
within Brooklyn Grazing Homestead Perpetual
Lease. Native Title has been extinguished in the
Mining Leases by Deed of Grant.
Historical (1974-1987) mine records:
A nearly
complete record of mine production, including
amounts of mined rock consigned to the LGS has
been compiled using published and unpublished
archives, including reporting for State Royalty
returns.
The company has completed 32 diamond holes in this
same area of RC drilling and has established
Page 7
resourcing the new economy for a better tomorrow
Criteria
Explanation
Commentary
Probably reserves here. This grade control drilling
is defining the local detailed boundaries to these
Reserves.
Geology
Deposit type, geological setting and style
of mineralisation.
The Deposit
The Mt Carbine tungsten deposit is a sheeted quartz
vein deposit. Many sub-parallel, sub-vertical quartz
veins have been deposited in fractures developed
in the host rocks metasediments in a zone that
drilling and mapping of historical surface workings
have shown to be approximately 300m wide and at
least 1.4km long, trending at about 315 degrees.
Grade Variation
Sampling, drill core logging, geostatistical analysis of
drill core assay data and mapping of the open pit
have determined that all the material mined during
the previous operation was mineralised to some
extent and that the mineralogy of the deposit was
uniform. There is little doubt that the mineralogy of
the stockpile material is identical to that mined and
processed. The material in the stockpile comprises
a single formation, the result of the alteration of
Siluro Devonian meta-sedimentary host rocks
(Forsythe and Higgins, 1990).
The amount of quartz veining varies within the
mineralised zone and previous mining and
exploration have been concentrated at the southeastern end of the mineralised zone. It is well
understood that there are high-grade zones within
the mineralisation in this part of the deposit and that
the higher-grade zones are surrounded by lower
grade mineralisation. Interpretation of recent drilling
suggests that the main high-grade zone may plunge
to the north of the present open pit. The previous
mine assumption that quartz vein abundance is
directly correlated with grade is not supported by an
independent review of quartz vein abundance and
grade.
Drill hole
Information
A summary of all information material to
the understanding of the exploration
results including a tabulation of the
following information for all Material
drill holes:
easting and northing of the drill hole
collar
elevation or RL (Reduced Level –
elevation above sea level in metres)
of the drill hole collar
dip and azimuth of the hole
down hole length and interception depth
hole length.
If the exclusion of this information is
justified on the basis that the
information is not Material and this
exclusion does not detract from the
understanding of the report, the
Competent Person should clearly
explain why this is the case
The purpose of the grade control drilling is to establish
further continuity between the 30 x 30m resource
diamond drilling program conducted by EQR. It is
important that this 10 x 10m pattern shows the
reserve model is robust and boundaries are marked
exactly for extraction. When data is sufficient a
separate block model will be undertaken to then be
representative to compare against the BFS Reserve
Model.
Page 8
resourcing the new economy for a better tomorrow
Criteria
Explanation
reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (e.g. cutting of high
grades) and cut-off grades are usually
Material and should be stated.
Where aggregate intercepts incorporate
short lengths of high-grade results
and longer lengths of low grade
results, the procedure used for such
aggregation should be stated and
some typical examples of such
aggregations should be shown in
detail.
The assumptions used for any reporting
of metal equivalent values should be
clearly stated
These relationships are particularly
Relationship
important in the reporting of
between
Exploration Results.
mineralisation
If
the
geometry of the mineralisation with
widths and
respect
to the drill hole angle is
intercept length
known, its nature should be reported.
• If it is not known and only the down
hole lengths are reported, there
should be a clear statement to this
effect (e.g. ‘down hole length, true
width not known’).
Appropriate maps and sections (with
Diagrams
scales) and tabulations of intercepts
should be included for any significant
discovery being reported These
should include, but not be limited to a
plan view of drill hole collar locations
and appropriate sectional views.
Where comprehensive reporting of all
Balanced
Exploration Results is not practicable,
reporting
representative reporting of both low
and high grades and/or widths should
be practiced to avoid misleading
reporting of Exploration Results.
Other exploration data, if meaningful and
Other
material, should be reported including
substantive
(but not limited to): geological
exploration
observations; geophysical survey
data
results; geochemical survey results;
bulk samples – size and method of
treatment; metallurgical test results;
bulk
density,
groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.
The nature and scale of planned further
Further work
work (e.g. tests for lateral extensions
or depth extensions or large-scale
step-out drilling).
Diagrams clearly highlighting the areas
of possible extensions, including the
main geological interpretations and
future drilling areas, provided this
Data
aggregation
methods
In
Commentary
The results shown in this report are the weighted
composition of the mineralised zones. The location
of each hole is shown on plan and section and has
been checked for accuracy.
The true width for any mineralisation is calculated
based on the angle of drilling and the angle the vein
dips at. Given most veins intersected are vertical
+/= 3 degrees a calculation of true width can be
made. Essentially true widths are 50-60% of the
down hole widths.
Sample locations are shown in Figure 1.
N/A
N/A
Assays of all grade control drilling will be reported to
give the shareholders a fair and balance
understanding of the mine model verses the
Reserve Model Prediction. Given the density of the
drilling is 3 x, it is suggested by the Competent
Person that the RC infill program will bring
resources into the measured category and hence
Page 9
resourcing the new economy for a better tomorrow
Criteria
Explanation
information
sensitive.
is
not
Commentary
commercially
provide further comfort that the mine grades
predicted are present.
Page 10
Share your feedback
Discover