EQR Signs Binding Agreement For US APT Plant JV
Released
Released
Announcement PDF
resourcing the new economy for a better tomorrow
REGISTERED OFFICE: Level 7, 410 Queen Street, Brisbane, QLD 4000
PRINCIPAL PLACE OF BUSINESS: 6888 Mulligan Highway, Mt Carbine Qld 4871
POSTAL ADDRESS: PO Box 1496, Mareeba Qld 4880
ABN: 77 115 009 106 (ASX: EQR)
T: (07) 4094 3072 | F: (07) 4094 3036 | W: eqresources.com.au
15 September 2026
EQR SIGNS BINDING FRAMEWORK AGREEMENT FOR US APT PLANT JV
EQ Resources Ltd is a global tungsten producer with operations in Australia and Spain.
Highlights:
• EQR to acquire a 10% interest in a new US tungsten processing JV with The Elmet Group
(TEG) (70%) and Blue Moon Metals Inc. (Blue Moon) (20%) to restart, own and operate the
4,000 tpa Springer ammonium paratungstate (APT) plant in Nevada, USA.
• EQR to contribute its technical expertise, including engineering and project management
oversight, ore-sorting technology and to supply 4,000 tonnes (in aggregate) of contained
WO₃ in concentrate to the JV under an eight-year spot priced offtake agreement following
APT plant commissioning.
• TEG to fund the first US$75 million of restart expenditure for refurbishment and
commissioning of the Springer APT plant, supported by financing from the US Department
of War.
• Blue Moon to contribute the Springer APT plant and associated infrastructure, and grant the
JV 100% offtake rights over tungsten concentrates produced from its Springer Mine.
• TEG and EQR to fund any restart costs between US$75 million and US$100 million pro rata
to their relative interests, with EQR’s additional exposure capped at US$3.125 million.
• All restart costs above US$100 million to be funded by the JV parties pro rata to their
ownership interests.
EQ Resources Limited (ASX: EQR) (EQR or the Company) is pleased to announce that it has entered into a
binding framework agreement (the Agreement) with The Elmet Group (NASDAQ: ELMT) (TEG) and Blue
Moon Metals Inc. (NASDAQ: BMM) (Blue Moon) in relation to the proposed restart and operation of the
ammonium paratungstate (APT) processing plant (the Springer Plant) at the Springer Tungsten Project in
Nevada, United States (Springer Project).
The Agreement provides for the establishment of a new joint venture (JV) to own, restart and operate the
existing Springer Plant, with EQR to hold an initial 10% interest. Elmet would hold 70% and act as operator,
while Blue Moon would hold the remaining 20%. EQR would have the right to appoint one nominee director to
the JV. Implementation of the JV remains subject to the negotiation and execution of definitive agreements
(see below and Appendix 1).
EQR’s ownership stake in the JV grants the Company significant strategic benefits, including:
• The right during the first five years of operations to access up to 1,000 tpa of APT processing capacity
at the Springer Plant
• A spot-priced offtake agreement under which the JV will purchase 4,000 tonne (in aggregate) of WO3
in concentrate from EQR over an eight-year period.
resourcing the new economy for a better tomorrow
Page 2
• The opportunity to commercialise EQR’s processing and ore-sorting expertise through a proposed
technology licence to Blue Moon for the Springer Project.
• A further strategic position in the Western tungsten supply chain, critical to Western economies and
defence.
Offtake and Licensing
EQR has the right to access up to 1,000 tpa of APT plant capacity (25% of Phase 1 capacity) during the first
five years of operations. The JV plans to enter into an eight-year spot-priced offtake agreement with EQR for
4,000 tonnes (in aggregate) of WO₃ in concentrate supplied by EQR, nominally 500 tonnes per annum,
commencing from commissioning of the APT plant. The offtake agreement may be extended by mutual
agreement in rolling one-year periods.
The Agreement also provides the potential for EQR to licence its ore-sorting technology for use at the Springer
Project, subject to technical suitability.
The Company notes that while the Agreement is binding as to its principal terms, implementation of the JV
remains subject to the negotiation and execution of definitive agreements. EQR will provide further updates as
material developments occur.
Material terms of the Agreement are set out in Appendix 1 to this announcement.
EQR Managing Director, Craig Bradshaw, said:
“This transaction is transformational for EQR. The agreement to enter into the JV for the Springer Project
delivers a 10% interest in what will be the premier APT facility in North America.
“Importantly, it provides an eight-year offtake agreement for 4,000 tonnes of contained WO₃ from our mines,
as well as a leading role in the engineering and project delivery of the Springer Plant, all while validating the
ore-sorting technology EQR has developed across our operations.
“Partnering with Blue Moon and The Elmet Group, with the sponsorship of the US Department of War, cements
EQR's position as a globally significant supplier of this critical mineral and opens a strategic new market for
our Australian and Spanish production.”
ENDS
Released on authority of the Board by Craig Bradshaw, Managing Director, EQ Resources.
Further information:
Rosalyn MacNeill John Gardner
Investor Relations VECTOR Advisors
ir@eqresources.com.au jgardner@vectoradvisors.au
M: +61 413 355 997
About the Company
EQ Resources Limited is a leading global tungsten mining company dedicated to sustainable mining and processing
practices. The Company is listed on the Australian Securities Exchange (ASX: EQR), with a focus on expanding its world-
class tungsten assets at Mt Carbine in North Queensland (Australia) and at Barruecopardo in the Salamanca Province
(Spain). The Company leverages advanced minerals processing technology and unexploited resources across multiple
jurisdictions, with the aim of being a globally leading supplier of the critical mineral, tungsten. The Company aims to create
shareholder value through the exploration and development of its current project portfolio whilst continuing to evaluate
corporate and exploration opportunities within the new economy and critical minerals sector globally.
Follow us:
resourcing the new economy for a better tomorrow
Page 3
About The Elmet Group
The Elmet Group is a US.-based provider of critical materials, precision-engineered components, and advanced high-
energy systems for the Aerospace, Defense and Government, Industrial, Medical, Semiconductor and Electronics, and
Energy industries. TEG operates through three divisions, Critical Materials Components (CMC), Engineered Microwave
Products (EMP) and Elmet Refining & Trading, leveraging materials science and precision engineering expertise to deliver
high-performance solutions. The Elmet Group is dedicated to strengthening domestic manufacturing capabilities to support
the Uniited States and its allies’ needs in both critical materials and advanced high-power microwave systems.(
https://theelmetgroup.com/)
About Blue Moon Metals
Blue Moon is advancing 5 brownfield polymetallic projects, including the Nussir copper-gold-silver project in Norway, the
NSG copper-zinc-gold-silver project in Norway, the Blue Moon zinc-gold-silver-copper project in the United States, the
Springer Project in the United States and the Apex germanium-gallium-copper project in the United States. All 5 projects
are well located with existing local infrastructure including roads, power and historical infrastructure. Zinc, copper and
tungsten are currently on the USGS and EU list of metals critical to the global economy and national security and
germanium and gallium are also on the USGS list of critical metals. Major shareholders include Teck Resources Limited,
funds managed by Oaktree Capital Management, Hartree Partners LP, Wheaton Precious Metals, Altius Minerals
Corporation, Baker Steel Resources Trust, LNS and Monial. (www.bluemoonmetals.com).
The Springer Project site comprises an existing mine, mill and APT plant. The APT plant is currently on care and
maintenance; refurbishment, upgrades and commissioning are required before production could be recommenced.
Springer Project mill facilities include:
• Process plant ~1,200 tpd capacity to produce tungsten concentrates and/or APT.
• Electrical infrastructure including main substation (69kV to 5kV), transformers, switchgear, MCCs, soft starters,
substations.
• Crusher & conveying system.
• Ancillary facilities including hoist house, mine substation, maintenance pads, warehouse, offices.
• Tailings storage facilities (conventional and dry stack).
• Roads, tankage, and other miscellaneous surface infrastructure associated with the operation.
• Water rights.
Forward-looking Statements
This announcement may contain forward-looking statements. Often, but not always, forward looking statements can
generally be identified by the use of forward looking words such as ‘may’, ‘will’, ‘expect’, ‘intend’, ‘plan’, ‘estimate’,
‘anticipate’, ‘continue’, and ‘guidance’, or other similar words and may include, without limitation, statements regarding
plans, strategies and objectives of management, anticipated production or construction commencement dates and
expected costs or production outputs. Forward looking statements inherently involve known and unknown risks,
uncertainties and other factors that may cause the Company’s actual results, performance and achievements to differ
materially from any future results, performance or achievements. Relevant factors may include, but are not limited to,
changes in commodity prices, foreign exchange fluctuations and general economic conditions, increased costs and
demand for production inputs, the speculative nature of exploration and project development, including the risks of
obtaining necessary licenses and permits and diminishing quantities or grades of reserves, political and social risks,
changes to the regulatory framework within which the Company operates or may in the future operate, environmental
conditions including extreme weather conditions, recruitment and retention of personnel, industrial relations issues and
litigation. Forward looking statements are based on the Company and its management’s good faith assumptions relating
to the financial, market, regulatory and other relevant environments that will exist and affect the Company’s business and
operations in the future. The Company does not give any assurance that the assumptions on which forward looking
statements are based will prove to be correct, or that the Company’s business or operations will not be affected in any
material manner by these or other factors not foreseen or foreseeable by the Company or management or beyond the
Company’s control. Although the Company attempts and has attempted to identify factors that would cause actual actions,
events or results to differ materially from those disclosed in forward looking statements, there may be other factors that
could cause actual results, performance, achievements or events not to be as anticipated, estimated or intended, and
many events are beyond the reasonable control of the Company. Accordingly, readers are cautioned not to place undue
reliance on forward looking statements. Forward looking statements in these materials speak only at the date of issue.
Subject to any continuing obligations under applicable law or any relevant stock exchange listing rules, in providing this
information the Company does not undertake any obligation to publicly update or revise any of the forward-looking
statements or to advise of any change in events, conditions or circumstances on which any such statement is based.
Neither the Australian Securities Exchange nor its Regulation Services Provider (as that term is defined in policies of the
Australian Securities Exchange) accepts responsibility for the adequacy or accuracy of this announcement.
resourcing the new economy for a better tomorrow
Page 4
Appendix 1 – Material Terms of Agreement
Term Summary
Parties EQR, Elmet and Blue Moon.
Project
Formation of a Joint Venture JV to restart, own and operate the existing APT plant at
the Springer Project in Nevada.
Initial ownership Elmet 70%; Blue Moon 20%; EQR 10%.
Governance
Seven-member JV board comprising four Elmet nominees, two Blue Moon nominees
and one EQR nominee.
Initial funding
The current estimated restart cost is approximately US$75 million, to be provided by
Elmet. Blue Moon to contribute the existing APT plant and associated infrastructure
and to grant the JV 100% offtake rights over tungsten concentrates produced from its
Springer Mine.
Funding above
US$75 million
Restart and upgrade expenditure between US$75 million and US$100 million is
proposed to be funded by Elmet and EQR in proportion to their relative interests,
being 87.5% (up to US$21.875 million) and 12.5% (up to US$3.125 million)
respectively.
Funding above
US$100 million
Expenditure above US$100 million, and future expansion expenditure, would be
funded by the JV participants in proportion to their ownership interests, subject to
customary dilution provisions where a participant elects not to contribute.
APT Plant
capacity
Phase 1 is targeted to provide approximately 4,000 tonnes tpa processing capacity.
Further expansions would be demand-driven.
EQR capacity
allocation
During the first five years, EQR would be allocated the lesser of its offtake volume or
25% of plant capacity, subject to a cap of 1,000 tonnes per annum.
EQR offtake
The JV would enter into an eight-year spot priced offtake agreement for 4,000 tonnes
(in aggregate) of WO₃, nominally 500 tonnes per annum, commencing from
commissioning of the APT plant. The agreement may be extended in rolling one-year
periods by mutual agreement.
EQR technical
role
EQR would provide APT plant design, engineering, project management,
commissioning and ore-sorting expertise, and would participate in the project design
committee.
Ore-sorting
licence
Subject to technical suitability, EQR and Blue Moon intend to negotiate a licence for
EQR’s ore-sorting know-how and expertise for use at the Springer project.
Option to
increase
ownership
Following completion of Phase 1 and 12 months of full operations and positive cash
flow ramp-up, Blue Moon and EQR would have an option to acquire a further
aggregate 15% interest in the JV on agreed terms.
Definitive
agreements
The transaction remains subject to due diligence, engineering and financial review,
negotiation and execution of definitive agreements, regulatory and exchange
approvals, and other customary conditions.
Timing
The parties are targeting completion of the principal definitive agreements within 90
days, with the site master plan to be completed within six months.
Exclusivity
Certain exclusivity obligations apply for 90 days from the effective date of the
Agreement.
Status of
Agreement
The Agreement is binding subject to finalisation of the Definitive Agreements.
Share your feedback