Clarification - Non Compliance with ASX Listing Rule 5.12
Released
Released
Announcement PDF
resourcing the new economy for a better tomorrow
REGISTERED OFFICE: Suite 2, Level 11, 385 Bourke Street, Melbourne, VIC 3000
PRINCIPAL PLACE OF BUSINESS: 6888 Mulligan Highway, Mt Carbine Qld 4871
POSTAL ADDRESS: PO Box 1496, Mareeba Qld 4880
ABN: 77 115 009 106 (ASX: EQR)
T: (07) 4094 3072 | F: (07) 4094 3036 | W: eqresources.com.au
28 April 2026
CLARIFICATION ANNOUNCEMENT – NON COMPLIANCE WITH
ASX LISTING RULE 5.12
EQ Resources Ltd is a global tungsten producer with mining activities in Australia and Spain.
EQ Resources Limited (ASX: EQR) (“EQR” or “the Company”) advises that the Company has become aware
of an inadvertent breach of Listing Rule 5.12 in relation to its announcements starting with EQR Identifies 5
Exploration Targets for Wolfram Camp released on 7 October 2024, and then subsequently referenced in EQ
Resources Limited Annual Report 2024, EQR Noosa Conference Investor Presentation released on 24 July
2025, EQR Progresses Regional Tungsten Hub Strategy Announcement 18 June 2025, EQR Investor
Presentation on 5 September 2025, Updated Investor Presentation 22 October 2025, EQ Resources Annual
Report 2025, and Investor Presentation-Euroz Hartleys Conference released on 18 March 2026.
Listing Rule 5.12 requires the Company, when reporting historical estimates relating to a material mining
project, to include certain information in the market announcement, which is stated below and should be read
together with all announcements referenced above and all future announcements relating to the Wolfram
Camp Project:
The historic resource estimate for the Wolfram Camp Mine Exploration Permit Minerals RA442 licence, is a
historic estimate and not in accordance with the JORC Code. The Company notes that the estimate and historic
drilling results from programs completed in 2012-2015 are reported in accordance with NI 43-101, by Qualified
Person Adam Wheeler, as attached to the announcement (NI 43-101 Estimate). A Competent Person has
not done sufficient work to classify the NI 43-101 Estimate as JORC Code Mineral Resources or JORC Code
Ore Reserves (as relevant) in accordance with the JORC Code 2012. As such the mineral resources and
mineral reserve estimates within the NI 43-101 Estimate are classified as ‘foreign estimates’ under the ASX
Listing Rules. In accordance with ASX Listing Rule 5.12, EQR provides additional information in relation to
these foreign estimates in Schedule 1 below.
It is uncertain that following evaluation or further exploration work that the NI 43-101 Estimate will be able to
be reported as Mineral Resources or Ore Reserves in accordance with the JORC Code. It is possible that
following further evaluation and/or exploration work that the confidence in NI 43-101 Estimate may be reduced
when reported under the JORC Code 2012. Nothing has come to the attention of the Company that causes it
to question the accuracy or reliability of the NI 43-101 Estimate, but the Company has not independently
validated this estimate and therefore it is not to be regarded as reporting, adopting or endorsing these
estimates.
The Company apologises for the oversight and reaffirms its commitment to full compliance with the ASX Listing
Rules and to maintaining high standards of corporate governance.
SCHEDULE 1
ASX LISTING RULE EQR RESPONSE
5.12 Subject to rule 5.13, an entity
reporting historical estimates or
foreign estimates of
mineralisation in relation to a
material mining project must
include all of the following
See sections below for information regarding the historic estimate.
resourcing the new economy for a better tomorrow
Page 2
information in a market
announcement and give it to ASX
for release to the market
5.12.1 The source and date of the
historical estimates or foreign
estimates
The NI 43-101 Estimate was prepared by Qualified Person (as
defined in the Canadian NI 43-101 Standards), Adam Wheeler, who
was an independent mining consultant based at Cambrose Farm,
Redruth, Cornwall, England at the date of the Report. The Canadian
NI 43-101 Standard is a national instrument for the Standards of
Disclosure for Mineral Projects within Canada. These foreign
estimates are the most recent Mineral Reserve and Mineral Resource
estimates for the Wolfram Camp Project.
5.12.2 Whether the historical
estimates or foreign estimates
use categories of mineralisation
other than those defined in
Appendix 5A (JORC Code) and if
so, an explanation of the
differences
The NI 43-101 Estimate was prepared using the Canadian NI 43-101
reporting guidelines. EQR believes that the categories of
mineralisation reported under Canadian NI 43-101 Standards are
similar to the JORC Code 2012 categories. EQR considers the foreign
estimate to be NI 43-101 compliant. EQR considers that the foreign
estimates are sufficiently reliable and consistent with current industry
standard estimation methodologies as generally appropriate for
Mineral Resource and Ore Reserve estimation. The Mineral Resource
estimate contains categories of NI 43-101 ‘Measured’, ‘Indicated’ and
‘Inferred’, that are consistent with the terminology of the Measured’,
‘Indicated’ and ‘Inferred’ under the JORC Code 2012. NI 43-101
Mineral Reserves are reported as Proven and Probable in the foreign
estimate. These classifications are consistent with definitions of
Proved and Probable Ore Reserves in the JORC Code 2012.
5.12.3 The relevance and
materiality of the historical
estimates or foreign estimates to
the entity
EQR intends to commence a drilling program in FY27 at Wolfram
Camp Project. Once the results of this drilling program are
completed, EQR then will be in a position to determine how material
these estimates are and whether the estimates can be considered
within the definition of JORC Code 2012 compliant resources. It is not
certain that further evaluation and/or exploration work will define
resources or ore reserves.
5.12.4 The reliability of the
historical estimates or foreign
estimates, including by reference
to any of the criteria in Table 1 of
Appendix 5A (JORC Code) which
are relevant to understanding the
reliability of the historical
estimates or foreign estimates
The NI 43-101 Estimate is considered to be reliable by EQR for the
following reasons:
• The foreign estimate was prepared in accordance with Canadian
National Instrument 43-101 (NI 43-101) and the CIM Definition
Standards, which are internationally recognised reporting
standards broadly comparable with the JORC Code in respect of
transparency, materiality and competence.
• The foreign estimate is documented in the technical report titled
“Technical Report on the Mineral Resource and Reserves of the
Wolfram Camp Mine Project” dated 31 October 2015, which was
prepared by a Qualified Person in accordance with NI 43-101.
The Qualified Person has accepted responsibility for the
underlying data, geological interpretation and estimation
methodology, and has confirmed that the work satisfies the due
diligence, verification and professional care requirements of NI
43-101.
• The Qualified Person was independent of the previous owner of
the Wolfram Camp Project, which supports the objectivity of the
estimation process and the conclusions reached.
EQR has undertaken a review of the foreign estimate and the
supporting technical information available to it, including geological
data, drilling and sampling information (to the extent available),
historical mining records and site inspections. Based on this review,
resourcing the new economy for a better tomorrow
Page 3
EQR considers that the assumptions, parameters, modifying factors
and estimation methodologies adopted in the foreign estimate are
reasonable in the context of the style of mineralisation and the mining
methods contemplated. Completed Table 1 of Appendix 5A (JORC
Code) below provides additional clarification & information.
EQR considers that the geological setting, mineralisation style and
historical mining performance at Wolfram Camp are consistent with
the framework described in the foreign estimate, and do not indicate
any material inconsistencies that would invalidate reliance on that
estimate as a foreign estimate. The drilling, sampling, assaying,
database compilation and estimation practices described in the NI 43-
101 report are considered by EQR to be consistent with industry
practice at the time the work was undertaken and are of a standard
sufficient to support the foreign estimate.
EQR is not aware of any material information that materially conflicts
with the foreign estimate, nor any matter that would cause it to
conclude that the foreign estimate is unreliable as a statement of the
mineralisation at the time it was prepared.
Notwithstanding the above, a Competent Person has not done
sufficient work to classify the foreign estimate as a Mineral Resource
or Ore Reserve in accordance with the JORC Code (2012).
Accordingly, the foreign estimate should not be regarded as a Mineral
Resource or Ore Reserve reported in accordance with the JORC
Code, and it remains uncertain that, following further evaluation
and/or exploration work, the foreign estimate will be able to be
reported as a Mineral Resource or Ore Reserve in accordance with
the JORC Code.
5.12.5 To the extent known, a
summary of the work programs on
which the historical estimates or
foreign estimates are based and a
summary of the key assumptions,
mining and processing
parameters and methods used to
prepare the historical estimates or
foreign estimates
The foreign estimate for the Wolfram Camp Project is based on
historical exploration and mining activities undertaken by previous
operators, as compiled in the NI 43-101 Estimate.
Work programs supporting the estimate include diamond and reverse
circulation drilling, underground development and sampling, surface
trenching, and geological mapping of greisen-hosted tungsten
mineralisation. Drilling density varies across the deposit, with closer
spacing in historically mined areas.
Sampling is understood to comprise diamond core and RC drilling,
with assays for WO₃ determined using industry standard analytical
techniques. More recent programs incorporated QA/QC procedures
including standards, blanks, and duplicates; however, earlier
historical QA/QC data is incomplete and has not been independently
verified by EQR.
The estimate is reported to have been prepared using three-
dimensional geological modelling and block modelling techniques
with grade interpolation by industry standard methods. Classification
was based on drill spacing, geological continuity, and data
confidence, although detailed estimation parameters have not been
independently verified.
Key assumptions include the application of cut-off grades based on
economic parameters at the time of reporting (typically in the order of
0.05%–0.10% WO₃), bulk density assumptions consistent with
greisen mineralisation (approximately 2.6–2.8 t/m³), and tungsten
resourcing the new economy for a better tomorrow
Page 4
price assumptions aligned with prevailing ammonium paratungstate
(APT) prices at the time.
Mining assumptions are understood to reflect open pit extraction
methods consistent with historical operations at Wolfram Camp, with
potential for underground mining in deeper zones. Processing
assumptions are based on conventional gravity concentration
methods, supported by historical plant performance, with typical
tungsten recoveries in the range of approximately 60% to 75%.
EQR has not undertaken sufficient work to independently verify the
work programs, assumptions, or estimation methodology
underpinning the foreign estimate, and there remains uncertainty
regarding the reliability of certain historical data inputs.
5.12.6 Any more recent estimates
or data relevant to the reported
mineralisation available to the
entity
As at the date of this announcement, the foreign estimates reported
in the Report have not been superseded by any later estimates. No
more recent estimates have been completed or provided to EQR.
5.21.7 The evaluation and/or
exploration work that needs to be
completed to verify the historical
estimates or foreign estimates as
Mineral Resources or Ore
Reserves in accordance with ASX
Listing Rules Appendix 5A (JORC
Code).
EQR intends to commence a drilling program in FY27 at Wolfram
Camp Project. After conclusion of this programme, it proposes to
undertake an evaluation of the data available to seek to verify the
foreign estimate as Mineral Resources or Ore Reserves in
accordance with the JORC Code. This evaluation will involve the full
verification of all information and applicable modifying factors used in
estimates in the Report, together with the addition of information and
results from the drilling program. External consultants will be used as
required.
5.12.8 The proposed timing of any
evaluation and/or exploration
work that the entity intends to
undertake and a comment on how
the entity intends to fund that work
The evaluation work is planned to be completed during FY27. Funding
for this work will be from internal cash flows.
5.12.9 A cautionary statement
proximate to, and with equal
prominence as, the reported
historical estimates or foreign
estimates stating that: The
estimates are historical estimates
or foreign estimates and are not
reported in accordance with the
JORC Code
EQR cautions that the NI 43-101 Estimate is not reported in
accordance with the JORC Code 2012. A Competent Person has not
yet completed sufficient work to classify the NI 43-101 Estimates as
JORC Code Mineral Resources or JORC Code Ore Reserves in
accordance with the JORC Code 2012. It is uncertain that following
evaluation and/or further exploration work that the NI 43-101 Estimate
will be able to be reported as Mineral Resource or Ore Reserves in
accordance with the JORC Code. Nothing has come to the attention
of EQR that causes it to question the accuracy or reliability of the NI
43- 101 Estimate, but EQR has not independently validated those
estimates and therefore EQR is not to be regarded as reporting,
adopting or endorsing those estimates.
5.12.10 A statement by a named
competent person or persons that
the information in the market
announcement provided under
rules 5.12.2 to 5.12.7 is an
accurate representation of the
available data and studies for the
material mining project. The
statement must include the
information referred to in rule 5.22
(b) and (c).
Mr Tony Bainbridge is the Competent Person for this announcement.
The following statement has been included in the Competent Person
section:
The information in this statement that relates to exploration results,
mineral resources or ore reserves is based on information compiled
by Tony Bainbridge, who is a Member of the Australasian Institute of
Mining and Metallurgy (AusIMM No. 112770). Mr Bainbridge is
engaged as a contractor to EQ Resources Ltd and is therefore not
independent within the meaning of the JORC Code (2012). Mr
Bainbridge has sufficient experience which is relevant to the style of
mineralisation and type of deposits under consideration and to the
activity that he is undertaking to qualify as a Competent Person as
defined in the 2012 edition of the ‘Australian Code for Reporting
resourcing the new economy for a better tomorrow
Page 5
Exploration Results, Mineral Resources and Ore Reserves’ (the
JORC Code). Mr Bainbridge consents to the inclusion of this
information in the form and context in which it appears in this
statement.
resourcing the new economy for a better tomorrow
REGISTERED OFFICE: Suite 2, Level 11, 385 Bourke Street, Melbourne, VIC 3000
PRINCIPAL PLACE OF BUSINESS: 6888 Mulligan Highway, Mt Carbine Qld 4871
POSTAL ADDRESS: PO Box 1496, Mareeba Qld 4880
ABN: 77 115 009 106 (ASX: EQR)
T: (07) 4094 3072 | F: (07) 4094 3036 | W: eqresources.com.au
Table 1 Appendix 5A (JORC Code)
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to produce a 30 g charge
for fire assay’). In other cases more explanation may be required,
such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of detailed information.
• The Wolfram Camp Mine Project has been sampled by a mixture of
diamond (including PQ and HQ) drill holes and Reverse Circulation
percussion (‘RC’) drill holes. Blasthole exploration (BEX) holes and
grade control (GC) drilling have also been completed.
• Queensland Ore Limited (QOL)
In the main, QOL sampled its diamond holes on geological or mineral
boundaries such that most intersections sent for assay were less than
1m.
The RC samples were taken via a cyclone at 1m intervals. All samples
other than sediments were riffle split to produce a +/-2kg sample for
analysis.
• Planet Metals Limited (PML)
Core sampling was based on ½ core sampling, with limited selective
sampling; as a consequence of the very spotty nature of the wolfram
and molybdenum mineralisation the core was cut in such a way as to
bisect the mineralisation with ideally equal portions being present on
each half of the core.
All samples were assayed for W, Mo, Bi, As and Sn using the ME-
XRF05 method; where samples exceeded the detection limits for that
method, they were re-assayed using the ME-XRF15c method.
For RC drilling PML used a riffle splitter to collect a 2-3kg sample.
Drill holes were sampled predominantly over 1m intervals.
resourcing the new economy for a better tomorrow
Page 7
Criteria JORC Code explanation Commentary
• Wolfram Camp Mining (WCM)
Open pit blasthole samples from grade control drilling results have
assays for W, Mo, Bi, As and Fe.
Drilling
techniques
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what method, etc).
• A limited amount of drilling may have been carried out before the 1970s
and although data exists for surface and underground drilling
completed in the 1970s, there are no detailed records of this work. The
various drilling programs completed at Wolfram Camp since the 1970s
are summarised below; in terms of diamond drillholes (DD) and reverse
circulation (RC) drillholes, stemming from exploration work done by
previous owners between 1995-2010, as well as blasthole exploration
samples (BEX) completed by Almonty since 2014:
• 1981-82, Tenneco Oil and Minerals (Tenneco) – 12 DD holes.
• 1994-96, Allegiance Mining NL (Allegiance) – 37 RC holes.
• 2005-06, Queensland Ore Limited (QOL) – 163 holes, mostly RC.
• 2010, Planet Metals Limited (PML) - 200 holes, mostly RC.
• 2014-15, Almonty – 1,417 BEX holes (generally 25m in length).
• 2012-present, Wolfram Camp Mining (WCM) - 55,195 grade
control (GC) holes
• Queensland Ore Limited (QOL)
During June to December 2005, QOL drilled 36 diamond drillholes in
for a total of 2437.8m. Holes were collared in PQ (providing a nominal
85mm core) and reduced to HQ (providing a nominal 63.5mm core)
once ground conditions were considered suitable.
In December 2005, 15 (RC) holes were drilled for a total of 939m and
a further 112 RC holes totalling 5,357m between April and December
2006, using a 4.5” (114mm) bit.
• Planet Metals Limited (PML)
PML drilled 200 holes comprising 45 DD totalling 2,269m and 155 RC
holes totalling 2,571m between September 2009 and February 2010.
• Almonty Industries Inc (Almonty)
Since 2014 Almonty has completed 1,417 blasthole exploration (BEX)
holes completed covering 36,092m.
resourcing the new economy for a better tomorrow
Page 8
Criteria JORC Code explanation Commentary
• Wolfram Camp Mining (WCM)
Since restart of the mine in 2012, grade control (GC) drilling results
have been accumulated from open pit blasthole samples. This
database now consists of data from 55,195 GC holes, covering over
321km of drilling.
Drill sample
recovery
• Method of recording and assessing core and chip sample recoveries
and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
• QOL – Drilling
All core was transferred directly from the core barrel to correctly sized
aluminium core trays at the rig site. Wooden core blocks were placed
in the trays to record downhole depths at the end of each drill run. At
intervals the core trays were carefully transported to a centralised core
handling area.
Excellent sample recovery was noted for the RC drilling programs.
• PML – Drilling
Sample recovery in the mineralised zone is believed to be high for PML
RC drill holes.
Logging • Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
• Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
• The total length and percentage of the relevant intersections logged.
• QOL – Logging
Core was geologically logged by either company geological staff or
experienced geological consultants. Alpha angles were measured
throughout of any contacts or major discontinuities in the core, and
where successful core orientation was achieved, beta angles were also
measured. Basic geotechnical logging was carried out with Rock
Quality Designation (RQD) factors calculated for all core.
• PML – Logging
Drill core samples were put into core trays and transported from the
drill site to the sample preparation shed where they were marked up
and logged. A geological and geotechnical log was completed for each
of the holes. The geological logging system used by PML was similar
to that used by the previous owners of the Wolfram Mine tenements.
A sample from each 1m RC interval was put in a numbered chip tray
which was then photographed and each 1m sample was logged.
Sub-sampling
techniques
• If core, whether cut or sawn and whether quarter, half or all core
taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and
• QOL Sampling
All core was transferred directly from the core barrel to correctly sized
aluminium core trays at the rig site. Wooden core blocks were placed
resourcing the new economy for a better tomorrow
Page 9
Criteria JORC Code explanation Commentary
and sample
preparation
whether sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
• Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
• Measures taken to ensure that the sampling is representative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the material
being sampled.
in the trays to record downhole depths at the end of each drill run. At
intervals the core trays were carefully transported to a centralised core
handling area.
Core samples were selected by geological logging and sawn such that
one quarter core was sent to the laboratory. Sample intervals were
selected on geological criteria, with the maximum sample length (other
than two samples) of one metre. A sample collection method was
introduced whereby the same progressive quarter core was selected
for all intervals, irrespective of the distribution of mineralisation within
the whole core, to eradicate any sampling bias.
Core samples were transported to ALS Chemex’s laboratory in
Townsville where sample preparation was carried out. All samples
were weighed, dried and crushed (two passes) to a nominal 6mm.
Samples containing coarse molybdenite which had been identified by
QOL were spread on to a plastic mat and the coarse molybdenite was
hand picked, weighed and bagged. The remainder of these samples,
and the whole of the other samples, were individually pulverised to 85%
passing 75microns. A 300gm extract from each sample was sent to
ALS Chemex’s Brisbane laboratory.
With the coarse molybdenite samples, the weight of the hand-picked
molybdenite was converted to Mo (multiplied by 0.5994), and this
weight of Mo was divided by the original weight of the sample times
100 to establish the percentage Mo, which when added to the XRF
result provided the total Mo content of the sample.
The QOL RC samples were taken via a cyclone into plastic sacks at
1m intervals. All samples other than sediments were split using a Jones
Riffle Splitter to produce a +/-2kg sample for analysis. This sample was
collected directly in pre-numbered calico bags. A matching sample
number tag was inserted in each bag which was then tied up.
All drill samples were sent to ALS-Chemex’s laboratory in Brisbane for
preparation and XRF analysis for Mo, W, Bi, As and Sn. ALS Chemex
carried out routine internal checks on the assays from QOL’s Wolfram
Camp samples.
• Planet Metals Limited (PML)
resourcing the new economy for a better tomorrow
Page 10
Criteria JORC Code explanation Commentary
Core sampling was based on ½ core sampling, with limited selective
sampling; as a consequence of the very spotty nature of the wolfram
and molybdenum mineralisation the core was cut in such a way as to
bisect the mineralisation with ideally equal portions being present on
each half of the core.
All intercepts of quartz greisen and quartz pipe material were cut as
these rock types contain the bulk of the high grade mineralisation, and
map appear to be barren until cut.
For RC drilling PML used an 87.5:12.5 riffle splitter attached to the base
of the cyclone and a 2-3kg sample was collected in a calico bag
beneath the 12.5 chute.
Drill holes were sampled predominantly over 1m intervals.
PML discontinued the practice of handpicking coarse grained
molybdenite devised by QOL. All samples were assayed for W, Mo, Bi,
As and Sn using the ME-XRF05 method; where samples exceeded the
detection limits for that method, they were re-assayed using the ME-
XRF15c method, which uses a lithium borate flux to produce a fused
glass disc.
ALS considered method ME- XRF15c to be more accurate than ME-
XRF07; however, it has only been available since early 2009. ALS
stated that due to the hardness of common tungsten minerals, in most
cases higher concentrations of tungsten may cause bias in the order
of 10-15% on the low side by method ME-XRF05. The fusion method
ME-XRF15c does not suffer from these mineralogical effects.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is considered
partial or total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
• Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels
of accuracy (ie lack of bias) and precision have been established.
• QOL Drilling
Discrepancies between Mo assay results and visual estimates of
molybdenite content from the first 49 RC holes resulted in eighteen RC
samples with high visible molybdenite content being manually re-split
through a riffle-splitter. The resplit samples were sent to Townsville to
undergo the same hand-picking process used with selected intervals
of diamond core.
Results showed less variation in Mo values than expected, although 16
showed a minor increase in Mo grade. Repeatability of the W grade
proved far more erratic with 15 samples showing increased W grade
resourcing the new economy for a better tomorrow
Page 11
Criteria JORC Code explanation Commentary
(including one from 0.095% to 2.92%) whilst 3 showed minor
decreases in grade.
Blanks and assay standard samples were used, with blanks inserted in
sample batches as samples with numbers ending in 00 and 50 and
standards inserted as samples ending in 25 and 75. Standards were
acquired from CANMET Mining and Mineral Science Laboratories,
Ottawa, Canada, and from CDN Resources Laboratories Limited,
British Columbia, Canada.
Analyses of these samples showed excellent quality control in the
laboratory, again indicating all variations are due to the nugget effect
in the mineralisation.
95 RC intervals were randomly selected for re-splitting through a riffle
splitter. Of the 95 samples 42 (44%) showed an increase in Mo content
in the second sample (with 12 showing variation of less than 5%) and
35 (37%) showed an increase in W content in the second sample (with
18 showing variation of less than 5%).
A number of pulps (originally assayed at Ultratrace) were re-assayed
at ALS in Townsville and an excellent correlation between the two sets
of assays was returned.
Sample and assay data have been acquired in accordance with
acceptable industry standards.
• PML Drilling
The QAQC results for drilling indicated that the assays for the PML
drilling program were satisfactory for resource estima
Share your feedback
Discover