EQ Resources Limited Annual Report 2024

For the presentation of this project, a slightly aggressive optimisation has been performed on its inputs to achieve the largest occupied areas and greatest volumes to be produced. Left: Current open pit design in purple, waste dump in green; Right: Phase 1 Project 2035, open pit in red and waste dump in purple. Final design: Project 2035, open pit in red and waste dump in purple. Continuous Improvement in Grade Control Given the importance of grade control in the operations at Saloro, daily procedures have been adjusted while maintaining the QAQC standards, to achieve an increasingly accurate grade control block model. This improved model will be used for future revisions of the resource model. EQ Resources Limited Annual Report 2024 55

RkJQdWJsaXNoZXIy MjE2NDg3