In addition to the capacity of the dams distributed across the mine site, during the dry season, work was carried out to evaporate water from the dams, with the implementation of vegetation irrigation systems and dust suppression systems on mine roads and in the processing plant areas. Additionally, mining operations extended deeper into the pit to construct a sump. This development allowed excess water to be directed and collected in a designated control area, from where it could be pumped out. This measure prevented the water from interfering with other mining activities. Finally, to enhance water consumption and evaporation systems, progress was made on the construction of the next phases of the project. Irrigation and evaporation systems in operation on the Barruecopardo site. The process has been initiated to request an increase in the allowed discharge volume of water from the main dam from the local environmental water authority to enhance flexibility in water management during the rainy season. Eastern Slope Stability Improvement Following the analysis of geotechnical data collected in the area with potential instability, a decision was made to execute a pushback on the eastern slope. This action was taken to enhance the stability of the slope, thereby ensuring greater safety for future deep mining operations. The pushback required an additional movement of 655,000 tonnes of material. Barruecopardo Open Pit pushback works on the eastern slope. Operating and Financial Review continued 52 EQ Resources Limited Annual Report 2024
RkJQdWJsaXNoZXIy MjE2NDg3